Planning approved in Padstow, so what happens now?
An approval notice feels like the finish line and is really the starting gun. Before anyone digs in Padstow, three things need dealing with: the conditions attached to the consent, the building regulation package, and the structural design. Conditions in particular catch people out, because some of them are pre-commencement, which means work started before they are discharged is technically unauthorised. Once drawings are approved, the build is the bit that decides whether you get the home you imagined or a frustrating compromise. We deliver projects on a single contract — design, drawings, approvals and construction — so the team that drew it is the team that builds it. The Padstow version of this work has its own character — Padstow is a working fishing harbour on the Camel Estuary, AONB-designated, with one of the strongest period property markets in Cornwall and a tight Conservation Area covering the inner harbour, with a building stock that leans toward Georgian harbour terraces and modern coastal homes at Trevone and Trethillick.
Padstow sits in North Cornwall — just off the A389; with Truro the closest city; 5 miles from Wadebridge.
- Conservation Area
- Cornwall AONB
- Coastal exposure zone
- ✓Decision notice reviewed and conditions listed out
- ✓Pre-commencement items discharged before site starts
- ✓Building regulation and structural package prepared
- ✓Build delivered by the same North Cornwall studio that drew it, if you want it that way
Free · No obligation
Free Padstow feasibility call
Tell us about your full build package. We reply within 1 working day — no obligation.
Our process
How a Padstow full build package project runs.
Step 1
Pre-construction
Programme, procurement, contractor briefing and site setup.
Step 2
Substructure
Foundations, drainage, ground beams — the unglamorous bit that decides everything later.
Step 3
Superstructure
Frame, roof, glazing — getting the building watertight.
Step 4
First and second fix
Services, plaster, joinery, kitchens and bathrooms.
Step 5
Snag and handover
Final inspection, building control sign-off, handover pack and aftercare.
Full builds run from twelve weeks for small extensions to eighteen months for new build family homes.
Local proof — Our North Cornwall workload means a Padstow full build package project never has to wait for an out-of-county team to drive down.
Get a free feasibility viewScope
The parts of the job we can take on in Padstow
These stages can be bought separately. Most PL28 projects use three of them.
Measured survey
An accurate record of what is actually there, which is where most avoidable cost is removed.
Heritage and design statements
Written justification where designation makes the design case as important as the drawing.
Full design and build
One contract from first sketch to handover, with the same team on paper and on site.
Who this is for
What we can genuinely back up in Padstow
- Applications for Padstow are handled through Cornwall Council, with Bodmin the nearest planning office we deal with regularly.
- Design and build are offered from the same studio, which means the person answering your Padstow questions has seen the detail built.
- Sites we know on the ground here include the area around the harbour and Prideaux Place.
- Drawings, planning and building regulations are all produced in-house, so a full build package enquiry does not get passed between firms.
Planning rules change and every site is different. For the final position on your address, check with Cornwall Council as the local planning authority or the Planning Portal.
Keep reading
Other work we do around Padstow
We cover Padstow and the wider PL28 district directly, typically alongside jobs in Wadebridge. Full Build enquiries here are common enough that we know the constraints before the first visit.
Page purpose
How a Padstow build actually runs
This is delivery, not paperwork. The value here is programme, sequencing and a single point of responsibility for a PL28 site. In Padstow that usually means access, storage and neighbour management get planned before the first delivery arrives.
- Site set-up planned around Padstow access, parking and delivery constraints
- One programme covering trades, inspections and building control sign-off
- Materials specified for local exposure, not a generic national spec
- Weekly progress contact so decisions never hold up the programme
Quick check
Want a straight answer on whether your Padstow project is worth pursuing?
Send a few details — we'll come back within 1 working day with a plain-English view on planning risk, likely cost band and whether it's a project we'd take on.
Free · No obligation
Get a free feasibility view
For projects in Padstow and the PL28 area.
What we focus on
Full Build considerations specific to Padstow.
01
Single-contract delivery removes the gap between architect's intent and builder's interpretation — fewer change orders, less variation cost.
02
Material lead times to Cornwall are longer than the M5 corridor; sequencing orders early protects the build programme.
03
Weather windows on Cornish coastal sites are short — getting the building watertight before autumn matters more here than in central England.
04
Cornish trades are a tight community; using contractors who've worked together before saves weeks on programme and arguments on site.
Local context
Why Padstow is its own job.
Around Padstow (PL28), conservation Area is extensive, with most of the historic core protected. Padstow's Neighbourhood Plan operates a strong principal residence policy; second homes and holiday lets face explicit policy resistance. For full build package specifically, parts of Padstow sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Padstow drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. Reading Padstow properly up front saves more time than any drawing tool ever will. Most of our full build package work in Padstow lands on Georgian harbour terraces, with detailing that has to nod to the wider Rock streetscape. On older stock, the practical constraint is usually joinery, render and roof line rather than the extension itself. We draw those details out early so a full build package submission is not sent back for missing information. Confirm listing status with the local planning authority before assuming permitted development. Exposure is the real design driver near the water: wind-driven rain, salt and driving damp push detailing towards better weathering, sheltered openings and robust fixings. Where an AONB or coastal policy applies, visual impact usually carries more weight than size.
Planning note
Build delivery doesn't need planning, but planning conditions often dictate site setup, materials and working hours — we read every condition and build the programme around them.
Local watch-list
Common Padstow pitfalls we plan around.
Watch #1
Cornwall AONB and Heritage Coast across the whole peninsula
Watch #2
Principal residence sentiment from the parish on new dwellings
Watch #3
Tight medieval lanes around the harbour limiting site logistics
Watch #4
Granite-and-slate vernacular controls on visible elevations
Local fabric
Padstow full build — the local-studio difference.
Building stock
Across Padstow (PL28) we work on medieval merchant houses, Georgian harbour terraces, Victorian villas above the village, modern coastal homes at Trevone and Trethillick. Each stock type drives a different full build package response — Georgian harbour terraces in particular needs careful detailing here.
Parish & policy
Padstow is its own town in North Cornwall, with planning history that's specific to the PL28 catchment.
Coverage
We cover PL28 from our studio, with regular full build package jobs also running in Wadebridge. Most Padstow site visits get booked within the same week.
Do you work in Padstow regularly?
Yes — Padstow and the wider PL28 catchment are core territory. We're typically on a North Cornwall site at least once a week, so logistics are baked in, not bolted on.
Request a free visitRecent work nearby
Recent harbour-adjacent townhouse refurb hid services in a new internal core and freed the principal rooms.
See more recent North Cornwall work →Who this is for
Padstow runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every full build package enquiry from the use-class up.
FAQs
Padstow Full Build — local questions answered.
- What is a pre-commencement condition?
- A condition that has to be discharged before any work begins, commonly covering materials, drainage strategy, ecology or construction management. Starting work before discharging one can invalidate the permission, so it is worth checking the notice line by line.
- How long does planning permission last?
- Permissions normally carry a time limit within which work must begin, stated on the decision notice itself. Check the wording on yours rather than relying on a general rule.
- Do I need new drawings after approval?
- Yes. The approved drawings show the scheme; the building regulation and construction package shows how it is built. That second set is what the builder and building control work from.
- When should I get prices?
- Once the technical drawings exist. Pricing from planning drawings alone produces quotes that are not comparable, because each builder is filling in the missing detail differently.
- Are you insured?
- Public liability, employer's liability and contractor's all-risks cover are in place for every project, with certificates available before contract signing. In Padstow specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
- Can you build from someone else's drawings?
- Yes, with a review. We'll happily build from approved drawings produced elsewhere, after a technical review to confirm the design holds up at construction stage.
- How do you handle changes during the build?
- Weekly client meetings, written change requests, costed and signed before work proceeds. No surprise invoices.
Other services in Padstow
Nearby places we cover
Read the decision notice properly, discharge anything pre-commencement, get the technical package drawn and only then price the work. Doing those in order is what keeps a Padstow build on programme.