South Cornwall · PL23 · Cornwall Council Central
Golant extensions — a South Cornwall studio
Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. Anchor any Golant extension in the local fabric and the rest follows — Golant is a creekside settlement in the PL23 area, with waterside homes, wooded valleys and narrow-lane access shaping the brief, with a building stock that leans toward waterside homes and creekside cottages.
Golant sits in South Cornwall — just off the A39; covering PL23 from Fowey, Bodinnick, Mixtow outward.
- Conservation Area
- Cornwall AONB
- Coastal exposure zone
- ✓Cornwall Council Central sub-area regulars
- ✓Free first site visit, no obligation
- ✓Conservation Area experience built into the fee
- ✓Same team on paper as on site
Free · No obligation
Free Golant feasibility call
Tell us about your extension. We reply within 1 working day — no obligation.
Who this is for
In Golant the extension brief is almost always a private homeowner improving a forever home — so we lead with feasibility and long-term value, not show-home rhetoric.
Local watch-list
The PL23 constraints that shape a extension brief.
Watch #1
Conservation Area controls on materials, window proportions and roof form through central Golant
Watch #2
AONB landscape-impact testing on anything read in long views across South Cornwall
Watch #3
Exposure detailing on creekside cottages — fixings, render systems and joinery specified for salt-laden air
Watch #4
Party Wall notices and shallow roof voids typical of creekside cottages in the PL23 district
Local proof — Recent extension enquiries from Golant have clustered around waterside homes — we know the route through Cornwall Council on these.
Get a free feasibility viewFAQs
Golant Extensions — local questions answered.
- We live in the house. Can a extension in Golant be done while we stay put?
- Usually yes for single-storey and rear work, with a temporary kitchen or bathroom arrangement agreed before the start. Whole-house remodels and roof work in Golant are often easier if you move out for a few weeks. We set that expectation at feasibility stage rather than halfway through.
- How long does the whole process take?
- Allow roughly three months for design and approvals, then twelve to twenty weeks on site for a typical single-storey extension. Wraparounds and two-storey add-ons take longer, mostly through approval and groundworks. In Golant specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
- Will my house be liveable during the build?
- For most rear and side extensions, yes — we sequence the works so the kitchen and one bathroom stay functional until the new build is watertight and connected.
- Can you handle the build as well as the design?
- Yes — that's the whole point of the studio. One contract, one point of contact, no finger-pointing between architect and builder when something needs a decision on site.
- What about the Party Wall Act?
- If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period.
- How much does an extension cost in Cornwall?
- Build costs in Cornwall typically run from around £2,200 to £3,200 per square metre for a good-quality single-storey extension, more for kitchen-grade fit-out or complex glazing. We give a realistic budget before drawings start, not after.
Quick check
Want a straight answer on whether your Golant project is worth pursuing?
Send a few details — we'll come back within 1 working day with a plain-English view on planning risk, likely cost band and whether it's a project we'd take on.
Free · No obligation
Get a free feasibility view
For projects in Golant and the PL23 area.
Scope
What we can draw, survey and build around Golant
Clients in Golant take different slices of this list, and that is deliberate.
Structural coordination
Calculations coordinated with the drawings so building control sees one consistent story.
Planning application drawings
Existing and proposed plans, elevations, site and block plans drawn to validation standard.
Full design and build
One contract from first sketch to handover, with the same team on paper and on site.
Measured survey
An accurate record of what is actually there, which is where most avoidable cost is removed.
Construction and technical drawings
1:10 and 1:20 details for the parts of the job builders normally have to guess at.
Page purpose
Drawings only, or drawings through to handover in Golant?
Both routes are open on a PL23 project, and the honest answer depends on whether you already have a builder you trust. Plenty of Golant clients take the drawings, tender them locally, then come back to us for the build if the numbers do not stack up.
- Route one: feasibility, planning and a tender-ready technical pack
- Route two: the same pack, then the build under one contract
- Either way the survey and feasibility work is identical, so the decision can wait
- Fees quoted per stage against the PL23 scope, not as one opaque figure
Keep reading
Follow the chain: survey, drawings, build
Golant is covered from our Fowey run. Being a smaller place, the local detail matters more than the headline policy: lane access, neighbour proximity and what the immediate street already looks like.
Who this is for
Why this page exists, and who it is for
- Drawings, planning and building regulations are all produced in-house, so a extension enquiry does not get passed between firms.
- Designated-area work is routine here, so heritage and landscape statements are produced alongside the drawings rather than outsourced.
- Applications for Golant are handled through Cornwall Council, with Truro the nearest planning office we deal with regularly.
Planning rules change and every site is different. For the final position on your address, check with Cornwall Council as the local planning authority or the Planning Portal.
Local context
Why Golant is its own job.
The planning backdrop in South Cornwall is real, not abstract: creekside ecology, flood risk, trees and views across the water often matter as much as the building form itself. For extension specifically, parts of Golant sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Golant drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. Treat the PL23 parish brief as the design brief and the Golant application has somewhere to land. Whether the project is on waterside homes in the centre or further out toward Fowey, the extension response is locally tuned.
Planning note
Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.
What we focus on
Extensions considerations specific to Golant.
01
Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.
02
Drainage on older Cornish properties is rarely on a clean modern map; CCTV survey before design is often money well spent.
03
Extensions over a certain proportion of the original house trigger full Part L upgrade obligations to the existing building — worth knowing before brief is set.
04
Cornish granite and slate-hung walls react differently to new openings than modern brickwork — lintel choice and structural sequencing matter.
Our process
How a Golant extension project runs.
Step 1
Brief
We meet on site, talk through how you live now and what's missing from the current layout.
Step 2
Design
Two or three sketch directions with rough budgets, then refinement of the chosen route.
Step 3
Approvals
Planning or Cert of Lawfulness, then a full building regs package.
Step 4
Build
Either through your own builder with our drawings, or as a full build by our team.
Step 5
Handover
Snag, certify, hand over the keys to your new space.
Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.
Local fabric
Why a South Cornwall studio is the right fit for Golant extension.
Building stock
Across Golant (PL23) we work on creekside cottages, detached houses, boat sheds, converted barns, waterside homes. Each stock type drives a different extension response — waterside homes in particular needs careful detailing here.
Parish & policy
Golant sits in the parish of Golant, which matters for how parish-level consultation lands on a extension application.
Coverage
We cover PL23 from our studio, with regular extension jobs also running in Fowey, Bodinnick, Mixtow. Most Golant site visits get booked within the same week.
What does a first Golant consultation cost?
Nothing. We come to the property, walk the site, talk through what works on a PL23 plot and follow up with a written feasibility note inside a week — no obligation either way.
Request a free visitGolant is part of Fowey
Golant sits inside the Fowey catchment — we cover both as one extension territory.
See Extensions in Fowey →Other services in Golant
Nearby places we cover
Most Golant extension enquiries start with one honest conversation about what's actually allowed — and that conversation costs nothing. For the final position on any address, Cornwall Council or the Planning Portal is the place to confirm it.
Decide the route after the free Golant visit Booked alongside our Fowey runs.
Free · No obligation
Book a free visit in Golant
No obligation. Reply usually same working day.
