House Extensions in Gorran Haven

Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. In Gorran Haven, that work is shaped by the place itself — Gorran Haven is an AONB south coast cove village south of Mevagissey, with a tight Conservation Area at the harbour and a network of cliff paths to Dodman Point, with a building stock that leans toward traditional harbour cottages and Victorian villas.

  • Conservation Area
  • Cornwall AONB
  • Coastal exposure zone
  • Rural / open-countryside policy area

Local context

Why Gorran Haven is its own job.

Conservation Area covers the harbour village; AONB and Heritage Coast across the parish. Coastal margin and cliff sites face strict controls; Dodman Point conservation considerations apply nearby. For extension specifically, parts of Gorran Haven sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Gorran Haven drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That's why we treat every Gorran Haven project as a PL26-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.

What we focus on

Extensions considerations specific to Gorran Haven.

  • 01

    Drainage on older Cornish properties is rarely on a clean modern map; CCTV survey before design is often money well spent.

  • 02

    Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.

  • 03

    Extensions over a certain proportion of the original house trigger full Part L upgrade obligations to the existing building — worth knowing before brief is set.

Our process

How a Gorran Haven extension project runs.

  1. Step 1

    Brief

    We meet on site, talk through how you live now and what's missing from the current layout.

  2. Step 2

    Design

    Two or three sketch directions with rough budgets, then refinement of the chosen route.

  3. Step 3

    Approvals

    Planning or Cert of Lawfulness, then a full building regs package.

  4. Step 4

    Build

    Either through your own builder with our drawings, or as a full build by our team.

  5. Step 5

    Handover

    Snag, certify, hand over the keys to your new space.

Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.

FAQs

Gorran Haven Extensions — common questions.

What about the Party Wall Act?
If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period. In Gorran Haven specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
How much does an extension cost in Cornwall?
Build costs in Cornwall typically run from around £2,200 to £3,200 per square metre for a good-quality single-storey extension, more for kitchen-grade fit-out or complex glazing. We give a realistic budget before drawings start, not after.
Can you handle the build as well as the design?
Yes — that's the whole point of the studio. One contract, one point of contact, no finger-pointing between architect and builder when something needs a decision on site.
How long does the whole process take?
Allow roughly three months for design and approvals, then twelve to twenty weeks on site for a typical single-storey extension. Wraparounds and two-storey add-ons take longer, mostly through approval and groundworks.