West Cornwall · TR27 · Cornwall Council West
Hayle extensions — a West Cornwall studio
Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. On a Hayle site, the brief always meets the place — Hayle is a former industrial port and Cornish Mining World Heritage town spread along the Hayle estuary, with the three-mile dunes of Hayle Towans on its northern shore, with a building stock that leans toward dune-edge bungalows and industrial workers' terraces.
Hayle sits in West Cornwall — just off the A30; with Truro the closest city; 3 miles from St Ives.
- Conservation Area
- Cornish Mining World Heritage Site
- Coastal exposure zone
- ✓Free first site visit, no obligation
- ✓Plain-English feasibility before any drawings
- ✓Measured-survey accuracy from day one
- ✓One studio — design, planning and build under one roof
Free · No obligation
Free Hayle feasibility call
Tell us about your extension. We reply within 1 working day — no obligation.
Local proof — Our West Cornwall workload means a Hayle extension project never has to wait for an out-of-county team to drive down.
Get a free feasibility viewLocal context
Why Hayle is its own job.
The planning backdrop in West Cornwall is real, not abstract: hayle's World Heritage Site status applies to the harbour, foundry and Copperhouse areas — alterations and infill within those zones face heritage assessment. North Quay and Carnsew development pressure has shaped a strong local design code on materials and massing. For extension specifically, parts of Hayle sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the wider area forms part of the Cornish Mining World Heritage Site, which adds a heritage assessment layer to most material changes; coastal salt-laden air around Hayle drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. Treat the TR27 parish brief as the design brief and the Hayle application has somewhere to land. Whether the project is on dune-edge bungalows in the centre or further out toward Lelant, the extension response is locally tuned.
Planning note
Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.
What we focus on
Extensions considerations specific to Hayle.
01
Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.
02
Wind and sea-spray exposure can drive material choices on west-facing extensions; we detail accordingly.
03
Cornish granite and slate-hung walls react differently to new openings than modern brickwork — lintel choice and structural sequencing matter.
04
Drainage on older Cornish properties is rarely on a clean modern map; CCTV survey before design is often money well spent.
Who this is for
Why this page exists, and who it is for
- Sites we know on the ground here include the area around Foundry Square and the Towans dunes.
- Drawings, planning and building regulations are all produced in-house, so a extension enquiry does not get passed between firms.
- Designated-area work is routine here, so heritage and landscape statements are produced alongside the drawings rather than outsourced.
- Applications for Hayle are handled through Cornwall Council, with Truro the nearest planning office we deal with regularly.
Planning rules change and every site is different. For the final position on your address, check with Cornwall Council as the local planning authority or the Planning Portal.
Keep reading
Follow the chain: survey, drawings, build
Hayle works as a hub for us: the same extension team covers Angarrack, Phillack, Connor Downs and the surrounding TR27 villages, so a site visit here often takes in more than one address.
Page purpose
Drawings only, or drawings through to handover in Hayle?
Both routes are open on a TR27 project, and the honest answer depends on whether you already have a builder you trust. Plenty of Hayle clients take the drawings, tender them locally, then come back to us for the build if the numbers do not stack up.
- Route one: feasibility, planning and a tender-ready technical pack
- Route two: the same pack, then the build under one contract
- Either way the survey and feasibility work is identical, so the decision can wait
- Fees quoted per stage against the TR27 scope, not as one opaque figure
Scope
What we can draw, survey and build around Hayle
Clients in Hayle take different slices of this list, and that is deliberate.
Planning application drawings
Existing and proposed plans, elevations, site and block plans drawn to validation standard.
Commercial drawings
Change of use, fit-out and access documentation for Class E and mixed-use premises.
Structural coordination
Calculations coordinated with the drawings so building control sees one consistent story.
Construction and technical drawings
1:10 and 1:20 details for the parts of the job builders normally have to guess at.
Full design and build
One contract from first sketch to handover, with the same team on paper and on site.
Our process
How a Hayle extension project runs.
Step 1
Brief
We meet on site, talk through how you live now and what's missing from the current layout.
Step 2
Design
Two or three sketch directions with rough budgets, then refinement of the chosen route.
Step 3
Approvals
Planning or Cert of Lawfulness, then a full building regs package.
Step 4
Build
Either through your own builder with our drawings, or as a full build by our team.
Step 5
Handover
Snag, certify, hand over the keys to your new space.
Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.
Quick check
Want a straight answer on whether your Hayle project is worth pursuing?
Send a few details — we'll come back within 1 working day with a plain-English view on planning risk, likely cost band and whether it's a project we'd take on.
Free · No obligation
Get a free feasibility view
For projects in Hayle and the TR27 area.
Local fabric
Why Hayle homeowners pick a local studio for extension.
Building stock
Across Hayle (TR27) we work on industrial workers' terraces, Foundry-era cottages, Victorian semis, modern estates at Loggans, dune-edge bungalows. Each stock type drives a different extension response — dune-edge bungalows in particular needs careful detailing here.
Parish & policy
Hayle is its own town in West Cornwall, with planning history that's specific to the TR27 catchment.
Coverage
We cover TR27 from our studio, with regular extension jobs also running in St Ives, Lelant, Connor Downs. Most Hayle site visits get booked within the same week.
What does a first Hayle consultation cost?
Nothing. We come to the property, walk the site, talk through what works on a TR27 plot and follow up with a written feasibility note inside a week — no obligation either way.
Request a free visitRecent work nearby
Foundry Square shop-to-flat we ran kept industrial brick on the long elevation.
See more recent West Cornwall work →FAQs
Hayle Extensions — local questions answered.
- Will my house be liveable during the build?
- For most rear and side extensions, yes — we sequence the works so the kitchen and one bathroom stay functional until the new build is watertight and connected. In Hayle specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
- Do I need planning permission for an extension?
- Often no — single-storey rear extensions, side extensions and modest two-storey additions can sit inside permitted development on a typical detached house. Conservation Areas, AONB and Article 4 zones remove some of those rights, so we always check the address first.
- We live in the house. Can a extension in Hayle be done while we stay put?
- Usually yes for single-storey and rear work, with a temporary kitchen or bathroom arrangement agreed before the start. Whole-house remodels and roof work in Hayle are often easier if you move out for a few weeks. We set that expectation at feasibility stage rather than halfway through.
- How long does the whole process take?
- Allow roughly three months for design and approvals, then twelve to twenty weeks on site for a typical single-storey extension. Wraparounds and two-storey add-ons take longer, mostly through approval and groundworks.
- Can you handle the build as well as the design?
- Yes — that's the whole point of the studio. One contract, one point of contact, no finger-pointing between architect and builder when something needs a decision on site.
- What about the Party Wall Act?
- If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period.
Hayle is the hub for these neighbourhoods
We run extensions across Hayle and the surrounding TR27 neighbourhoods — same studio, same site team.
- Angarrack
TR27
- Phillack
TR27
- Connor Downs
TR27
- Gwinear
TR27
- Gwithian
TR27
- Godrevy
TR27
- Canonstown
TR27
- Leedstown
TR27
- Townshend
TR27
Other services in Hayle
Nearby places we cover
Local neighbourhoods in Hayle
If you're balancing ambition against TR27 planning realism, our Hayle extension work threads that needle without the usual drama. Applications are dealt with through Cornwall Council, with Truro the office we deal with most for TR27.
Scope your TR27 project with a local studio Free first visit, TR27 included.
Free · No obligation
Book a free visit in Hayle
No obligation. Reply usually same working day.
