West Cornwall · TR17

House Extensions in Marazion

Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. In Marazion, that work is shaped by the place itself — Marazion sits opposite St Michael's Mount across a tidal causeway and is one of Cornwall's oldest chartered towns, designated AONB for its setting, with a building stock that leans toward granite cottages and Georgian seafront houses.

  • Conservation Area
  • Cornwall AONB
  • Coastal exposure zone

Local context

Why Marazion is its own job.

The whole town centre is within the Conservation Area and the AONB; views to and from St Michael's Mount are a material planning consideration on most schemes. Roof pitches, ridge heights and seaward elevations are tightly controlled. For extension specifically, parts of Marazion sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Marazion drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. That's why we treat every Marazion project as a TR17-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.

What we focus on

Extensions considerations specific to Marazion.

  • 01

    Wind and sea-spray exposure can drive material choices on west-facing extensions; we detail accordingly.

  • 02

    Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.

  • 03

    Cornish granite and slate-hung walls react differently to new openings than modern brickwork — lintel choice and structural sequencing matter.

Our process

How a Marazion extension project runs.

  1. Step 1

    Brief

    We meet on site, talk through how you live now and what's missing from the current layout.

  2. Step 2

    Design

    Two or three sketch directions with rough budgets, then refinement of the chosen route.

  3. Step 3

    Approvals

    Planning or Cert of Lawfulness, then a full building regs package.

  4. Step 4

    Build

    Either through your own builder with our drawings, or as a full build by our team.

  5. Step 5

    Handover

    Snag, certify, hand over the keys to your new space.

Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.

FAQs

Marazion Extensions — common questions.

Do I need planning permission for an extension?
Often no — single-storey rear extensions, side extensions and modest two-storey additions can sit inside permitted development on a typical detached house. Conservation Areas, AONB and Article 4 zones remove some of those rights, so we always check the address first. In Marazion specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
How long does the whole process take?
Allow roughly three months for design and approvals, then twelve to twenty weeks on site for a typical single-storey extension. Wraparounds and two-storey add-ons take longer, mostly through approval and groundworks.
Can you handle the build as well as the design?
Yes — that's the whole point of the studio. One contract, one point of contact, no finger-pointing between architect and builder when something needs a decision on site.
What about the Party Wall Act?
If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period.

Planning a extension project in Marazion?

Start a conversation