North Cornwall · PL27

House Extensions in Polzeath

Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. In Polzeath, that work is shaped by the place itself — Polzeath is the surfing village above one of north Cornwall's biggest sandy beaches, AONB-designated, with a holiday-let-heavy housing stock and increasing replacement-dwelling activity, with a building stock that leans toward 1930s coastal villas and 1960s bungalows above the beach.

  • Cornwall AONB
  • Coastal exposure zone
  • Rural / open-countryside policy area

Local context

Why Polzeath is its own job.

AONB and Heritage Coast designations across the village; cliff and dune-edge sites are tightly controlled. Local plan policy on second homes and holiday lets is being progressively tightened. For extension specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Polzeath drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That's why we treat every Polzeath project as a PL27-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.

What we focus on

Extensions considerations specific to Polzeath.

  • 01

    Extensions over a certain proportion of the original house trigger full Part L upgrade obligations to the existing building — worth knowing before brief is set.

  • 02

    Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.

  • 03

    Wind and sea-spray exposure can drive material choices on west-facing extensions; we detail accordingly.

Our process

How a Polzeath extension project runs.

  1. Step 1

    Brief

    We meet on site, talk through how you live now and what's missing from the current layout.

  2. Step 2

    Design

    Two or three sketch directions with rough budgets, then refinement of the chosen route.

  3. Step 3

    Approvals

    Planning or Cert of Lawfulness, then a full building regs package.

  4. Step 4

    Build

    Either through your own builder with our drawings, or as a full build by our team.

  5. Step 5

    Handover

    Snag, certify, hand over the keys to your new space.

Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.

FAQs

Polzeath Extensions — common questions.

How long does the whole process take?
Allow roughly three months for design and approvals, then twelve to twenty weeks on site for a typical single-storey extension. Wraparounds and two-storey add-ons take longer, mostly through approval and groundworks. In Polzeath specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
Do I need planning permission for an extension?
Often no — single-storey rear extensions, side extensions and modest two-storey additions can sit inside permitted development on a typical detached house. Conservation Areas, AONB and Article 4 zones remove some of those rights, so we always check the address first.
Can you handle the build as well as the design?
Yes — that's the whole point of the studio. One contract, one point of contact, no finger-pointing between architect and builder when something needs a decision on site.
What about the Party Wall Act?
If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period.

Planning a extension project in Polzeath?

Start a conversation