North Cornwall · PL30

Extensions that reads St Tudy properly

Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. Reading St Tudy on the ground is half of the extension job — St Tudy is a rural parish in the PL30 area, with farmsteads, lanes and scattered homes defining its built character, with a building stock that leans toward farmhouses and rural cottages.

St Tudy sits in North Cornwall — covering PL30 from Bodmin, St Breward, Washaway outward.

  • Rural / open-countryside policy area
  • Same team on paper as on site
  • Fixed-fee planning packages, no surprise invoices
  • Measured-survey accuracy from day one
  • One studio — design, planning and build under one roof

Local watch-list

Common St Tudy pitfalls we plan around.

  • Watch #1

    Tighter Local Plan tests on isolated rural dwellings

Who this is for

St Tudy runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every extension enquiry from the use-class up.

Local context

Why St Tudy is its own job.

Around St Tudy (PL30), open-countryside policy, access lanes, drainage and agricultural building history all need to be addressed before drawings go too far. For extension specifically, Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. Reading St Tudy properly up front saves more time than any drawing tool ever will. Most of our extension work in St Tudy lands on farmhouses, with detailing that has to nod to the wider St Breward streetscape.

Planning note

Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.

What we focus on

Extensions considerations specific to St Tudy.

  • 01

    Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.

  • 02

    Extensions over a certain proportion of the original house trigger full Part L upgrade obligations to the existing building — worth knowing before brief is set.

  • 03

    Drainage on older Cornish properties is rarely on a clean modern map; CCTV survey before design is often money well spent.

  • 04

    Wind and sea-spray exposure can drive material choices on west-facing extensions; we detail accordingly.

Our process

How a St Tudy extension project runs.

  1. Step 1

    Brief

    We meet on site, talk through how you live now and what's missing from the current layout.

  2. Step 2

    Design

    Two or three sketch directions with rough budgets, then refinement of the chosen route.

  3. Step 3

    Approvals

    Planning or Cert of Lawfulness, then a full building regs package.

  4. Step 4

    Build

    Either through your own builder with our drawings, or as a full build by our team.

  5. Step 5

    Handover

    Snag, certify, hand over the keys to your new space.

Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.

FAQs

St Tudy Extensions — local questions answered.

How much does an extension cost in St Tudy?
Build costs in Cornwall typically run from around £2,200 to £3,200 per square metre for a good-quality single-storey extension, more for kitchen-grade fit-out or complex glazing. We give a realistic budget before drawings start, not after. In St Tudy specifically, we'd start by checking the latest parish-level planning history before committing to a direction.
Can you handle the build as well as the design?
Yes — that's the whole point of the studio. One contract, one point of contact, no finger-pointing between architect and builder when something needs a decision on site.
What about the Party Wall Act?
If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period.
Do I need planning permission for an extension?
Often no — single-storey rear extensions, side extensions and modest two-storey additions can sit inside permitted development on a typical detached house. Conservation Areas, AONB and Article 4 zones remove some of those rights, so we always check the address first.
How long does the whole process take?
Allow roughly three months for design and approvals, then twelve to twenty weeks on site for a typical single-storey extension. Wraparounds and two-storey add-ons take longer, mostly through approval and groundworks.

St Tudy is part of Bodmin

St Tudy sits inside the Bodmin catchment — we cover both as one extension territory.

See Extensions in Bodmin

Local proof — We typically have one or two extension jobs live in the PL30 area at any time, so the local planning officers know our drawings on sight.

Get a free feasibility view

On a St Tudy site the success of a extension is decided in week one — by reading the constraints right, not by drawing them away.

Take an honest look at your St Tudy options

Start a conversation
Call WhatsAppFree visit