Mid Cornwall · TR1
House Extensions in Truro
Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. In Truro, that work is shaped by the place itself — Truro is Cornwall's only city, the county town and home to Cornwall Council itself, with a Georgian core, three-spired cathedral and Lemon Quay at its centre, with a building stock that leans toward Georgian townhouses on Lemon Street and Victorian terraces in Hendra and Highertown.
- Conservation Area
Local context
Why Truro is its own job.
The Truro Conservation Area covers a wide central zone including Lemon Street, the cathedral precinct and the river frontage. As the home of Cornwall Council planning, it tends to set the tone for design expectations across the county. For extension specifically, parts of Truro sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape. That's why we treat every Truro project as a TR1-area job first — not a generic Cornwall job with a postcode bolted on.
Planning note
Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.
What we focus on
Extensions considerations specific to Truro.
01
Drainage on older Cornish properties is rarely on a clean modern map; CCTV survey before design is often money well spent.
02
Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.
03
Extensions over a certain proportion of the original house trigger full Part L upgrade obligations to the existing building — worth knowing before brief is set.
Our process
How a Truro extension project runs.
Step 1
Brief
We meet on site, talk through how you live now and what's missing from the current layout.
Step 2
Design
Two or three sketch directions with rough budgets, then refinement of the chosen route.
Step 3
Approvals
Planning or Cert of Lawfulness, then a full building regs package.
Step 4
Build
Either through your own builder with our drawings, or as a full build by our team.
Step 5
Handover
Snag, certify, hand over the keys to your new space.
Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.
FAQs
Truro Extensions — common questions.
- How much does an extension cost in Truro?
- Build costs in Cornwall typically run from around £2,200 to £3,200 per square metre for a good-quality single-storey extension, more for kitchen-grade fit-out or complex glazing. We give a realistic budget before drawings start, not after. In Truro specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
- Can you handle the build as well as the design?
- Yes — that's the whole point of the studio. One contract, one point of contact, no finger-pointing between architect and builder when something needs a decision on site.
- Will my house be liveable during the build?
- For most rear and side extensions, yes — we sequence the works so the kitchen and one bathroom stay functional until the new build is watertight and connected.
- What about the Party Wall Act?
- If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period.
