Once drawings are approved, the build is the bit that decides whether you get the home you imagined or a frustrating compromise. We deliver projects on a single contract — design, drawings, approvals and construction — so the team that drew it is the team that builds it. In Crantock, that work is shaped by the place itself — Crantock is an AONB village south-west of Newquay across the Gannel estuary, with a Norman church and a tight Conservation Area covering the village core, with a building stock that leans toward traditional cob and granite cottages and Victorian villas.
- Conservation Area
- Cornwall AONB
- Coastal exposure zone
- Rural / open-countryside policy area
Local context
Why Crantock is its own job.
Conservation Area covers the village including the church; AONB and Heritage Coast across the parish. Gannel estuary views and ecology shape applications on the eastern edge. For full build package specifically, parts of Crantock sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Crantock drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That's why we treat every Crantock project as a TR8-area job first — not a generic Cornwall job with a postcode bolted on.
Planning note
Build delivery doesn't need planning, but planning conditions often dictate site setup, materials and working hours — we read every condition and build the programme around them.
What we focus on
Full Build considerations specific to Crantock.
01
Weather windows on Cornish coastal sites are short — getting the building watertight before autumn matters more here than in central England.
02
Material lead times to Cornwall are longer than the M5 corridor; sequencing orders early protects the build programme.
03
Off-grid sites need their own water, drainage and power solutions designed and procured rather than assumed.
Our process
How a Crantock full build package project runs.
Step 1
Pre-construction
Programme, procurement, contractor briefing and site setup.
Step 2
Substructure
Foundations, drainage, ground beams — the unglamorous bit that decides everything later.
Step 3
Superstructure
Frame, roof, glazing — getting the building watertight.
Step 4
First and second fix
Services, plaster, joinery, kitchens and bathrooms.
Step 5
Snag and handover
Final inspection, building control sign-off, handover pack and aftercare.
Full builds run from twelve weeks for small extensions to eighteen months for new build family homes.
FAQs
Crantock Full Build — common questions.
- What guarantees and aftercare do you offer?
- Standard twelve-month defects period, plus product and workmanship warranties on relevant elements. We're a Cornish business — you'll still find us in the same studio in five years' time. In Crantock specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
- Are you insured?
- Public liability, employer's liability and contractor's all-risks cover are in place for every project, with certificates available before contract signing.
- Can you build from someone else's drawings?
- Yes, with a review. We'll happily build from approved drawings produced elsewhere, after a technical review to confirm the design holds up at construction stage.
- How do you handle changes during the build?
- Weekly client meetings, written change requests, costed and signed before work proceeds. No surprise invoices.