Project Management & Full Build in Lanivet
Once drawings are approved, the build is the bit that decides whether you get the home you imagined or a frustrating compromise. We deliver projects on a single contract — design, drawings, approvals and construction — so the team that drew it is the team that builds it. In Lanivet, that work is shaped by the place itself — Lanivet is a village south-west of Bodmin claiming to be the geographic centre of Cornwall, with a Norman church and a tight Conservation Area at the village core, with a building stock that leans toward traditional granite cottages and Victorian villas.
- Conservation Area
- Rural / open-countryside policy area
Local context
Why Lanivet is its own job.
Conservation Area covers the village core including the church. Bodmin and Wenford Railway and the A30 corridor shape edge-of-village development. For full build package specifically, parts of Lanivet sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That's why we treat every Lanivet project as a PL30-area job first — not a generic Cornwall job with a postcode bolted on.
Planning note
Build delivery doesn't need planning, but planning conditions often dictate site setup, materials and working hours — we read every condition and build the programme around them.
What we focus on
Full Build considerations specific to Lanivet.
01
Weather windows on Cornish coastal sites are short — getting the building watertight before autumn matters more here than in central England.
02
Single-contract delivery removes the gap between architect's intent and builder's interpretation — fewer change orders, less variation cost.
03
Material lead times to Cornwall are longer than the M5 corridor; sequencing orders early protects the build programme.
Our process
How a Lanivet full build package project runs.
Step 1
Pre-construction
Programme, procurement, contractor briefing and site setup.
Step 2
Substructure
Foundations, drainage, ground beams — the unglamorous bit that decides everything later.
Step 3
Superstructure
Frame, roof, glazing — getting the building watertight.
Step 4
First and second fix
Services, plaster, joinery, kitchens and bathrooms.
Step 5
Snag and handover
Final inspection, building control sign-off, handover pack and aftercare.
Full builds run from twelve weeks for small extensions to eighteen months for new build family homes.
FAQs
Lanivet Full Build — common questions.
- What guarantees and aftercare do you offer?
- Standard twelve-month defects period, plus product and workmanship warranties on relevant elements. We're a Cornish business — you'll still find us in the same studio in five years' time. In Lanivet specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
- Fixed price or open book?
- Both. Fixed price suits well-defined projects with clear specs; open book suits renovations and listed work where the unknowns only reveal themselves once you start opening things up. We'll recommend the right route.
- Do you handle the whole project from drawing to finish?
- Yes — that's the model. One contract from feasibility to handover, with design, regs and build all under our roof. No coordination gap between designer and contractor.
- Are you insured?
- Public liability, employer's liability and contractor's all-risks cover are in place for every project, with certificates available before contract signing.