West Cornwall · TR17

Project Management & Full Build in Marazion

Once drawings are approved, the build is the bit that decides whether you get the home you imagined or a frustrating compromise. We deliver projects on a single contract — design, drawings, approvals and construction — so the team that drew it is the team that builds it. In Marazion, that work is shaped by the place itself — Marazion sits opposite St Michael's Mount across a tidal causeway and is one of Cornwall's oldest chartered towns, designated AONB for its setting, with a building stock that leans toward granite cottages and Georgian seafront houses.

  • Conservation Area
  • Cornwall AONB
  • Coastal exposure zone

Local context

Why Marazion is its own job.

The whole town centre is within the Conservation Area and the AONB; views to and from St Michael's Mount are a material planning consideration on most schemes. Roof pitches, ridge heights and seaward elevations are tightly controlled. For full build package specifically, parts of Marazion sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Marazion drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. That's why we treat every Marazion project as a TR17-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Build delivery doesn't need planning, but planning conditions often dictate site setup, materials and working hours — we read every condition and build the programme around them.

What we focus on

Full Build considerations specific to Marazion.

  • 01

    Weather windows on Cornish coastal sites are short — getting the building watertight before autumn matters more here than in central England.

  • 02

    Cornish trades are a tight community; using contractors who've worked together before saves weeks on programme and arguments on site.

  • 03

    Single-contract delivery removes the gap between architect's intent and builder's interpretation — fewer change orders, less variation cost.

Our process

How a Marazion full build package project runs.

  1. Step 1

    Pre-construction

    Programme, procurement, contractor briefing and site setup.

  2. Step 2

    Substructure

    Foundations, drainage, ground beams — the unglamorous bit that decides everything later.

  3. Step 3

    Superstructure

    Frame, roof, glazing — getting the building watertight.

  4. Step 4

    First and second fix

    Services, plaster, joinery, kitchens and bathrooms.

  5. Step 5

    Snag and handover

    Final inspection, building control sign-off, handover pack and aftercare.

Full builds run from twelve weeks for small extensions to eighteen months for new build family homes.

FAQs

Marazion Full Build — common questions.

Do you handle the whole project from drawing to finish?
Yes — that's the model. One contract from feasibility to handover, with design, regs and build all under our roof. No coordination gap between designer and contractor. In Marazion specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
What guarantees and aftercare do you offer?
Standard twelve-month defects period, plus product and workmanship warranties on relevant elements. We're a Cornish business — you'll still find us in the same studio in five years' time.
How do you handle changes during the build?
Weekly client meetings, written change requests, costed and signed before work proceeds. No surprise invoices.
Are you insured?
Public liability, employer's liability and contractor's all-risks cover are in place for every project, with certificates available before contract signing.

Planning a full build package project in Marazion?

Start a conversation