Once drawings are approved, the build is the bit that decides whether you get the home you imagined or a frustrating compromise. We deliver projects on a single contract — design, drawings, approvals and construction — so the team that drew it is the team that builds it. In Mousehole, that work is shaped by the place itself — Mousehole is a famously photogenic fishing village south of Newlyn, almost entirely within the Conservation Area and AONB, with a tiny harbour and dense lanes of granite cottages, with a building stock that leans toward granite fishing cottages and Victorian villas above the village.

  • Conservation Area
  • Cornwall AONB
  • Coastal exposure zone

Local context

Why Mousehole is its own job.

Almost the entire village is within both the Conservation Area and AONB; new openings, dormers, render colours and roof materials all attract close scrutiny. Paul parish operates with strong policy resistance to second-home use. For full build package specifically, parts of Mousehole sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Mousehole drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. That's why we treat every Mousehole project as a TR19-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Build delivery doesn't need planning, but planning conditions often dictate site setup, materials and working hours — we read every condition and build the programme around them.

What we focus on

Full Build considerations specific to Mousehole.

  • 01

    Cornish trades are a tight community; using contractors who've worked together before saves weeks on programme and arguments on site.

  • 02

    Single-contract delivery removes the gap between architect's intent and builder's interpretation — fewer change orders, less variation cost.

  • 03

    Material lead times to Cornwall are longer than the M5 corridor; sequencing orders early protects the build programme.

Our process

How a Mousehole full build package project runs.

  1. Step 1

    Pre-construction

    Programme, procurement, contractor briefing and site setup.

  2. Step 2

    Substructure

    Foundations, drainage, ground beams — the unglamorous bit that decides everything later.

  3. Step 3

    Superstructure

    Frame, roof, glazing — getting the building watertight.

  4. Step 4

    First and second fix

    Services, plaster, joinery, kitchens and bathrooms.

  5. Step 5

    Snag and handover

    Final inspection, building control sign-off, handover pack and aftercare.

Full builds run from twelve weeks for small extensions to eighteen months for new build family homes.

FAQs

Mousehole Full Build — common questions.

What guarantees and aftercare do you offer?
Standard twelve-month defects period, plus product and workmanship warranties on relevant elements. We're a Cornish business — you'll still find us in the same studio in five years' time. In Mousehole specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
Fixed price or open book?
Both. Fixed price suits well-defined projects with clear specs; open book suits renovations and listed work where the unknowns only reveal themselves once you start opening things up. We'll recommend the right route.
Do you handle the whole project from drawing to finish?
Yes — that's the model. One contract from feasibility to handover, with design, regs and build all under our roof. No coordination gap between designer and contractor.
Are you insured?
Public liability, employer's liability and contractor's all-risks cover are in place for every project, with certificates available before contract signing.