Design, planning and build for St Ives full build package
Once drawings are approved, the build is the bit that decides whether you get the home you imagined or a frustrating compromise. We deliver projects on a single contract — design, drawings, approvals and construction — so the team that drew it is the team that builds it. What works on a TR26 plot rarely works elsewhere — St Ives is a designated Area of Outstanding Natural Beauty town with a tightly packed historic harbour, the Tate gallery and some of the steepest streets in Cornwall, with a building stock that leans toward modern hillside homes above the town and Edwardian guesthouses.
St Ives sits in West Cornwall — just off the A3074; with Truro the closest city; 1 miles from Carbis Bay, 3 miles from Hayle.
- Conservation Area
- Cornwall AONB
- Coastal exposure zone
- ✓Free first site visit, no obligation
- ✓Cornwall Council West sub-area regulars
- ✓One studio — design, planning and build under one roof
- ✓Local to West Cornwall — not a national franchise
Free · No obligation
Free St Ives feasibility call
Tell us about your full build package. We reply within 1 working day — no obligation.
Local watch-list
Local snags worth knowing before drawing a St Ives full build package.
Watch #1
Principal Residence policy ruling out new dwellings sold as second homes
Watch #2
Granite-walled cottages where loft conversion headroom is borderline
Watch #3
Stepped access on Downalong streets limiting plant and crane reach
Watch #4
Slate roof pitches that complicate dormer geometry
Who this is for
St Ives runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every full build package enquiry from the use-class up.
Page purpose
How a St Ives build actually runs
This is delivery, not paperwork. The value here is programme, sequencing and a single point of responsibility for a TR26 site. In St Ives that usually means access, storage and neighbour management get planned before the first delivery arrives.
- Site set-up planned around St Ives access, parking and delivery constraints
- One programme covering trades, inspections and building control sign-off
- Materials specified for local exposure, not a generic national spec
- Weekly progress contact so decisions never hold up the programme
Scope
Where our work starts and stops on a TR26 project
Clients in St Ives take different slices of this list, and that is deliberate.
Heritage and design statements
Written justification where designation makes the design case as important as the drawing.
Full design and build
One contract from first sketch to handover, with the same team on paper and on site.
Structural coordination
Calculations coordinated with the drawings so building control sees one consistent story.
Who this is for
Our footing in West Cornwall
- Designated-area work is routine here, so heritage and landscape statements are produced alongside the drawings rather than outsourced.
- Sites we know on the ground here include the area around Downalong and Porthmeor Beach.
- Drawings, planning and building regulations are all produced in-house, so a full build package enquiry does not get passed between firms.
- Applications for St Ives are handled through Cornwall Council, with Truro the nearest planning office we deal with regularly.
Planning rules change and every site is different. For the final position on your address, check with Cornwall Council as the local planning authority or the Planning Portal.
Keep reading
Related TR26 pages
St Ives works as a hub for us: the same full build package team covers Carbis Bay and the surrounding TR26 villages, so a site visit here often takes in more than one address.
Local context
Why St Ives is its own job.
Cornwall Council's lens on St Ives is consistent: st Ives operates a Neighbourhood Plan with a principal residence policy on most new dwellings — second homes and holiday lets face strong policy resistance. The Conservation Area covers Downalong, the harbour and most of the town centre, where granite, slate and lime-render detailing is non-negotiable. For full build package specifically, parts of St Ives sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around St Ives drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. That's why we treat every St Ives project as a TR26-area job first — not a generic Cornwall job with a postcode bolted on. The modern hillside homes above the town that dominate St Ives (and continue out toward Lelant) set the tone for any full build package scheme here. On older stock, the practical constraint is usually joinery, render and roof line rather than the extension itself. We draw those details out early so a full build package submission is not sent back for missing information. Confirm listing status with the local planning authority before assuming permitted development. Salt air and prevailing wind change specification long before they change planning. We tend to draw weathering details in full, then check whether coastal or AONB policy narrows the design options for this address.
Planning note
Build delivery doesn't need planning, but planning conditions often dictate site setup, materials and working hours — we read every condition and build the programme around them.
What we focus on
Full Build considerations specific to St Ives.
01
Off-grid sites need their own water, drainage and power solutions designed and procured rather than assumed.
02
Weather windows on Cornish coastal sites are short — getting the building watertight before autumn matters more here than in central England.
03
Cornish trades are a tight community; using contractors who've worked together before saves weeks on programme and arguments on site.
04
Material lead times to Cornwall are longer than the M5 corridor; sequencing orders early protects the build programme.
Quick check
Want a straight answer on whether your St Ives project is worth pursuing?
Send a few details — we'll come back within 1 working day with a plain-English view on planning risk, likely cost band and whether it's a project we'd take on.
Free · No obligation
Get a free feasibility view
For projects in St Ives and the TR26 area.
Recent work nearby
Carbis Bay clifftop rebuild we ran last year leaned on a granite plinth + standing-seam zinc roof.
See more recent West Cornwall work →Our process
How a St Ives full build package project runs.
Step 1
Pre-construction
Programme, procurement, contractor briefing and site setup.
Step 2
Substructure
Foundations, drainage, ground beams — the unglamorous bit that decides everything later.
Step 3
Superstructure
Frame, roof, glazing — getting the building watertight.
Step 4
First and second fix
Services, plaster, joinery, kitchens and bathrooms.
Step 5
Snag and handover
Final inspection, building control sign-off, handover pack and aftercare.
Full builds run from twelve weeks for small extensions to eighteen months for new build family homes.
FAQs
St Ives Full Build — local questions answered.
- Do you handle the whole project from drawing to finish?
- Yes — that's the model. One contract from feasibility to handover, with design, regs and build all under our roof. No coordination gap between designer and contractor. In St Ives specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
- Fixed price or open book?
- Both. Fixed price suits well-defined projects with clear specs; open book suits renovations and listed work where the unknowns only reveal themselves once you start opening things up. We'll recommend the right route.
- Who do you usually work for in St Ives?
- A genuine mix: owner-occupiers, second-home and holiday-let owners, small commercial clients and the occasional smallholding. That matters because the right route for a full build package depends on how the property is used, not just what it looks like, so we scope from the use first.
- What guarantees and aftercare do you offer?
- Standard twelve-month defects period, plus product and workmanship warranties on relevant elements. We're a Cornish business — you'll still find us in the same studio in five years' time.
- How do you handle changes during the build?
- Weekly client meetings, written change requests, costed and signed before work proceeds. No surprise invoices.
- Are you insured?
- Public liability, employer's liability and contractor's all-risks cover are in place for every project, with certificates available before contract signing.
St Ives is the hub for these neighbourhoods
We run full build across St Ives and the surrounding TR26 neighbourhoods — same studio, same site team.
- Carbis Bay
TR26
Local proof — Most St Ives full build package clients we work with are second-time builders — they've seen the templated approach fail once already.
Get a free feasibility viewOther services in St Ives
Nearby places we cover
Local neighbourhoods in St Ives
Designing a full build package in St Ives is as much about reading the parish as reading the brief; we do both, and the planning outcomes follow. For the final position on any address, Cornwall Council or the Planning Portal is the place to confirm it.