West Cornwall · TR13

Bespoke New Builds in Breage

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. Reading Breage on the ground is half of the new build job — Breage is a former mining settlement in the TR13 area, with granite terraces, chapel buildings and industrial landscape character still visible, with a building stock that leans toward granite terraces and workers cottages.

Breage sits in West Cornwall — covering TR13 from Helston, Ashton, Sithney outward.

  • Conservation Area
  • Cornish Mining World Heritage Site
  • Fixed-fee planning packages, no surprise invoices
  • Measured-survey accuracy from day one
  • One studio — design, planning and build under one roof
  • Local to West Cornwall — not a national franchise

Local watch-list

The TR13 constraints that shape a new build brief.

  • Watch #1

    Conservation Area material and fenestration controls in central Breage

  • Watch #2

    World Heritage Site assessment on changes visible in the mining landscape

Who this is for

Breage runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every new build enquiry from the use-class up.

Local context

Why Breage is its own job.

Mining heritage, old plot widths and traditional materials make proportion and detailing more important than generic extension templates. For new build specifically, parts of Breage sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the wider area forms part of the Cornish Mining World Heritage Site, which adds a heritage assessment layer to most material changes. So every Breage job runs as a TR13-specific piece of work — local policy, local fabric, local builders. Most of our new build work in Breage lands on granite terraces, with detailing that has to nod to the wider Ashton streetscape.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

What we focus on

New Builds considerations specific to Breage.

  • 01

    Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.

  • 02

    Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.

  • 03

    Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.

  • 04

    Cornwall's housing policy increasingly favours principal residence and replacement dwelling schemes over open-market new builds in some parishes.

Our process

How a Breage new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

FAQs

Breage New Builds — local questions answered.

How long does the whole project take?
Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that. In Breage specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
What about utilities, drainage and access?
All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required.
What's a replacement dwelling and is mine eligible?
If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history.
How much does a new build cost?
Realistic budgets in Cornwall start around £2,800 per square metre for a good-quality build and rise quickly with bespoke joinery, large glazing, complex sites and high-spec finishes. We work to your number, not against it.
Can I build a new house on my plot in Cornwall?
Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch.

Breage is part of Helston

Breage sits inside the Helston catchment — we cover both as one new build territory.

See New Builds in Helston

Local proof — We typically have one or two new build jobs live in the TR13 area at any time, so the local planning officers know our drawings on sight.

Get a free feasibility view

On a Breage site the success of a new build is decided in week one — by reading the constraints right, not by drawing them away.

Take an honest look at your Breage options

Start a conversation
Call WhatsAppFree visit