Lizard Peninsula · TR12 · Cornwall Council West

Cury new build — feasibility first, drawings second

📞 01736 449 281Free 15-min call · Reply within 1 working day · No sales calls

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. On a Cury site, the brief always meets the place — Cury is a rural parish in the TR12 area, with farmsteads, lanes and scattered homes defining its built character, with a building stock that leans toward farmhouses and smallholdings.

Cury sits in Lizard Peninsula — just off the A394; covering TR12 from Mullion, Gunwalloe, Predannack outward.

  • Cornwall AONB
  • Rural / open-countryside policy area
  • Cornwall Council West sub-area regulars
  • Free first site visit, no obligation
  • Plain-English feasibility before any drawings
  • 30+ years of Cornwall Council approvals

Free · No obligation

Free Cury feasibility call

Tell us about your new build. We reply within 1 working day — no obligation.

No spam · No sales calls · Your details stay private.

Who this is for

In Cury the new build brief is almost always a private homeowner improving a forever home — so we lead with feasibility and long-term value, not show-home rhetoric.

Local watch-list

What usually catches new build projects out in Cury.

  • Watch #1

    AONB landscape-impact testing on anything read in long views across Lizard Peninsula

  • Watch #2

    Local Plan tests on isolated dwellings, plus lane access for plant and deliveries around Cury

Local proof — Most Cury new build clients we work with are second-time builders — they've seen the templated approach fail once already.

Get a free feasibility view

FAQs

Cury New Builds — local questions answered.

Can I build a new house on my plot in Cury?
Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch. In Cury specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
Can you handle a self-build for me?
Yes — from feasibility to handover. Many of our clients start as 'self-builders' on paper, then hand the actual build to us once they realise how much project management it takes.
We live in the house. Can a new build in Cury be done while we stay put?
Usually yes for single-storey and rear work, with a temporary kitchen or bathroom arrangement agreed before the start. Whole-house remodels and roof work in Cury are often easier if you move out for a few weeks. We set that expectation at feasibility stage rather than halfway through.
What about utilities, drainage and access?
All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required.
What's a replacement dwelling and is mine eligible?
If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history.
How long does the whole project take?
Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.

Quick check

Want a straight answer on whether your Cury project is worth pursuing?

Send a few details — we'll come back within 1 working day with a plain-English view on planning risk, likely cost band and whether it's a project we'd take on.

✓ Free · No obligation✓ Reply within 1 working day✓ Your details stay private

Free · No obligation

Get a free feasibility view

For projects in Cury and the TR12 area.

No spam · No sales calls · Your details stay private.

Scope

What we can draw, survey and build around Cury

Clients in Cury take different slices of this list, and that is deliberate.

Full design and build

One contract from first sketch to handover, with the same team on paper and on site.

Measured survey

An accurate record of what is actually there, which is where most avoidable cost is removed.

Construction and technical drawings

1:10 and 1:20 details for the parts of the job builders normally have to guess at.

Heritage and design statements

Written justification where designation makes the design case as important as the drawing.

Building regulation drawings

Full Plans sets with sections, construction notes and coordinated structural information.

Page purpose

Drawings only, or drawings through to handover in Cury?

Both routes are open on a TR12 project, and the honest answer depends on whether you already have a builder you trust. Plenty of Cury clients take the drawings, tender them locally, then come back to us for the build if the numbers do not stack up.

  • Route one: feasibility, planning and a tender-ready technical pack
  • Route two: the same pack, then the build under one contract
  • Either way the survey and feasibility work is identical, so the decision can wait
  • Fees quoted per stage against the TR12 scope, not as one opaque figure

Keep reading

Follow the chain: survey, drawings, build

Cury is covered from our Mullion run. Being a smaller place, the local detail matters more than the headline policy: lane access, neighbour proximity and what the immediate street already looks like.

Who this is for

Why this page exists, and who it is for

  • Drawings, planning and building regulations are all produced in-house, so a new build enquiry does not get passed between firms.
  • Designated-area work is routine here, so heritage and landscape statements are produced alongside the drawings rather than outsourced.
  • Applications for Cury are handled through Cornwall Council, with Truro the nearest planning office we deal with regularly.

Planning rules change and every site is different. For the final position on your address, check with Cornwall Council as the local planning authority or the Planning Portal.

Local context

Why Cury is its own job.

Locally, open-countryside policy, access lanes, drainage and agricultural building history all need to be addressed before drawings go too far. For new build specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. Which is why we scope Cury projects parish-up, not template-down — the TR12 context shapes the design from day one. Whether the project is on farmhouses in the centre or further out toward Mullion, the new build response is locally tuned.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

What we focus on

New Builds considerations specific to Cury.

  • 01

    Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.

  • 02

    Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.

  • 03

    Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.

  • 04

    Cornwall's housing policy increasingly favours principal residence and replacement dwelling schemes over open-market new builds in some parishes.

Our process

How a Cury new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

Local fabric

Why Cury homeowners pick a local studio for new build.

Building stock

Across Cury (TR12) we work on farmhouses, converted barns, rural cottages, smallholdings, scattered modern homes. Each stock type drives a different new build response — farmhouses in particular needs careful detailing here.

Parish & policy

Cury sits in the parish of Cury, which matters for how parish-level consultation lands on a new build application.

Coverage

We cover TR12 from our studio, with regular new build jobs also running in Mullion, Gunwalloe, Predannack. Most Cury site visits get booked within the same week.

What does a first Cury consultation cost?

Nothing. We come to the property, walk the site, talk through what works on a TR12 plot and follow up with a written feasibility note inside a week — no obligation either way.

Request a free visit

Cury is part of Mullion

Cury sits inside the Mullion catchment — we cover both as one new build territory.

See New Builds in Mullion

In short: take the drawings and run your own build in Cury, or keep it under one contract. Both routes start the same way. Parish-level consultation in Cury is worth planning for, not reacting to.

One conversation — and a clearer Cury brief We know how farmhouses behave here.

Free · No obligation

Book a free visit in Cury

No obligation. Reply usually same working day.

No spam · No sales calls · Your details stay private.

Call WhatsAppFree visit