West Cornwall · TR18
Bespoke New Builds in Heamoor
A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. In Heamoor, that work is shaped by the place itself — Heamoor is a residential village on the northern edge of Penzance, originally a separate hamlet, now effectively a suburb with its own primary school and parish identity, with a building stock that leans toward Victorian and Edwardian terraces and 1930s semis.
Local context
Why Heamoor is its own job.
Within Madron parish; outside Conservation Area and AONB. Edge-of-Penzance development pressure has driven significant new estate housing in the last twenty years. For new build specifically, Heamoor sits outside the headline designations, which usually gives a slightly more flexible starting point — but parish-level character still matters. That's why we treat every Heamoor project as a TR18-area job first — not a generic Cornwall job with a postcode bolted on.
Planning note
Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.
What we focus on
New Builds considerations specific to Heamoor.
01
Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.
02
Cornwall's housing policy increasingly favours principal residence and replacement dwelling schemes over open-market new builds in some parishes.
03
AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.
Our process
How a Heamoor new build project runs.
Step 1
Plot review
Site visit, planning history check, designation review and an honest feasibility verdict.
Step 2
Concept design
Sketches that test the plot in massing, orientation and approach before any drawings are committed.
Step 3
Planning
Pre-app, full planning, consultee management and condition discharge.
Step 4
Technical design and build prep
Building regs, structural design, services strategy and contractor procurement.
Step 5
Construction and handover
Build delivered under contract administration with regular client reviews.
Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.
FAQs
Heamoor New Builds — common questions.
- Can you handle a self-build for me?
- Yes — from feasibility to handover. Many of our clients start as 'self-builders' on paper, then hand the actual build to us once they realise how much project management it takes. In Heamoor specifically, we'd start by checking the latest parish-level planning history before committing to a direction.
- How much does a new build cost?
- Realistic budgets in Cornwall start around £2,800 per square metre for a good-quality build and rise quickly with bespoke joinery, large glazing, complex sites and high-spec finishes. We work to your number, not against it.
- What's a replacement dwelling and is mine eligible?
- If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history.
- How long does the whole project take?
- Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.