Bespoke New Builds in Kingsand

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. In Kingsand, that work is shaped by the place itself — Kingsand is the AONB twin village (with Cawsand) on the Rame Peninsula opposite Plymouth, with a tight Conservation Area covering the harbour and a strong period property market, with a building stock that leans toward traditional harbour cottages and Victorian villas.

  • Conservation Area
  • Cornwall AONB
  • Coastal exposure zone
  • Rural / open-countryside policy area

Local context

Why Kingsand is its own job.

Conservation Area covers Kingsand and Cawsand combined historic core; AONB across the Rame Peninsula. Cliff and coastal margin sites face strict controls. For new build specifically, parts of Kingsand sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Kingsand drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That's why we treat every Kingsand project as a PL10-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

What we focus on

New Builds considerations specific to Kingsand.

  • 01

    Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.

  • 02

    Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.

  • 03

    AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.

Our process

How a Kingsand new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

FAQs

Kingsand New Builds — common questions.

How much does a new build cost?
Realistic budgets in Cornwall start around £2,800 per square metre for a good-quality build and rise quickly with bespoke joinery, large glazing, complex sites and high-spec finishes. We work to your number, not against it. In Kingsand specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
Can you handle a self-build for me?
Yes — from feasibility to handover. Many of our clients start as 'self-builders' on paper, then hand the actual build to us once they realise how much project management it takes.
Can I build a new house on my plot in Cornwall?
Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch.
How long does the whole project take?
Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.