A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. Reading Lelant on the ground is half of the new build job — Lelant is the AONB estuary village south of St Ives, with a Norman church on the dunes, the West Cornwall Golf Club and one of the most stable period property markets in West Cornwall, with a building stock that leans toward 1930s detached houses and modern carefully detailed coastal replacements.
Lelant sits in West Cornwall — covering TR26 from Carbis Bay, St Ives, Hayle outward.
- Conservation Area
- Cornwall AONB
- Coastal exposure zone
- ✓ Same team on paper as on site
- ✓ Fixed-fee planning packages, no surprise invoices
- ✓ Measured-survey accuracy from day one
- ✓ One studio — design, planning and build under one roof
Local watch-list
Lelant-specific issues we screen on the first visit.
Watch #1
Conservation Area material and fenestration controls in central Lelant
Watch #2
AONB landscape-impact scrutiny on visible elevations
Watch #3
Coastal exposure driving fixing, render and joinery spec
Who this is for
Lelant runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every new build enquiry from the use-class up.
Local context
Why Lelant is its own job.
Conservation Area covers the village core and church; AONB across the parish. Estuary views and the Hayle estuary SSSI shape applications on the eastern edge of the village. For new build specifically, parts of Lelant sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Lelant drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. So every Lelant job runs as a TR26-specific piece of work — local policy, local fabric, local builders. Most of our new build work in Lelant lands on 1930s detached houses, with detailing that has to nod to the wider Hayle streetscape.
Planning note
Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.
What we focus on
New Builds considerations specific to Lelant.
01
Cornwall's housing policy increasingly favours principal residence and replacement dwelling schemes over open-market new builds in some parishes.
02
AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.
03
Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.
04
Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.
Our process
How a Lelant new build project runs.
Step 1
Plot review
Site visit, planning history check, designation review and an honest feasibility verdict.
Step 2
Concept design
Sketches that test the plot in massing, orientation and approach before any drawings are committed.
Step 3
Planning
Pre-app, full planning, consultee management and condition discharge.
Step 4
Technical design and build prep
Building regs, structural design, services strategy and contractor procurement.
Step 5
Construction and handover
Build delivered under contract administration with regular client reviews.
Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.
FAQs
Lelant New Builds — local questions answered.
- How long does the whole project take?
- Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that. In Lelant specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
- What about utilities, drainage and access?
- All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required.
- Can you handle a self-build for me?
- Yes — from feasibility to handover. Many of our clients start as 'self-builders' on paper, then hand the actual build to us once they realise how much project management it takes.
- Can I build a new house on my plot in Cornwall?
- Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch.
- What's a replacement dwelling and is mine eligible?
- If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history.
Lelant is part of Carbis Bay
Lelant sits inside the Carbis Bay catchment — we cover both as one new build territory.
See New Builds in Carbis Bay →Local proof — Our West Cornwall workload means a Lelant new build project never has to wait for an out-of-county team to drive down.
Get a free feasibility viewOther services in Lelant
Nearby places we cover
On a Lelant site the success of a new build is decided in week one — by reading the constraints right, not by drawing them away.