Bespoke New Builds in Mabe Burnthouse

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. In Mabe Burnthouse, that work is shaped by the place itself — Mabe Burnthouse is a residential village west of Penryn with strong commuter demand from the Falmouth and Truro areas and significant late-twentieth-century estate expansion, with a building stock that leans toward 1960s and 1970s estates and modern Persimmon and Bovis estates.

Local context

Why Mabe Burnthouse is its own job.

Outside Conservation Area and AONB but the wider parish includes designated areas. Mabe parish operates active input on edge-of-village schemes; granite quarrying heritage shapes some site planning. For new build specifically, Mabe Burnthouse sits outside the headline designations, which usually gives a slightly more flexible starting point — but parish-level character still matters. That's why we treat every Mabe Burnthouse project as a TR10-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

What we focus on

New Builds considerations specific to Mabe Burnthouse.

  • 01

    Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.

  • 02

    Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.

  • 03

    AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.

Our process

How a Mabe Burnthouse new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

FAQs

Mabe Burnthouse New Builds — common questions.

Can I build a new house on my plot in Mabe Burnthouse?
Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch. In Mabe Burnthouse specifically, we'd start by checking the latest parish-level planning history before committing to a direction.
How much does a new build cost?
Realistic budgets in Cornwall start around £2,800 per square metre for a good-quality build and rise quickly with bespoke joinery, large glazing, complex sites and high-spec finishes. We work to your number, not against it.
Can you handle a self-build for me?
Yes — from feasibility to handover. Many of our clients start as 'self-builders' on paper, then hand the actual build to us once they realise how much project management it takes.
What's a replacement dwelling and is mine eligible?
If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history.