Roseland · TR2
New Builds for Pendower (TR2)
A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. The way we approach new build in Pendower starts with a measured walk-round — Pendower is a holiday-coast settlement in the TR2 area, with strong second-home demand and exposed coastal building conditions, with a building stock that leans toward detached houses and coastal bungalows.
Pendower sits in Roseland — covering TR2 from Veryan, Portloe, Truro outward.
- Cornwall AONB
- Coastal exposure zone
- ✓ Measured-survey accuracy from day one
- ✓ One studio — design, planning and build under one roof
- ✓ Fixed-fee planning packages, no surprise invoices
- ✓ Plain-English feasibility before any drawings
Our process
How a Pendower new build project runs.
Step 1
Plot review
Site visit, planning history check, designation review and an honest feasibility verdict.
Step 2
Concept design
Sketches that test the plot in massing, orientation and approach before any drawings are committed.
Step 3
Planning
Pre-app, full planning, consultee management and condition discharge.
Step 4
Technical design and build prep
Building regs, structural design, services strategy and contractor procurement.
Step 5
Construction and handover
Build delivered under contract administration with regular client reviews.
Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.
Local proof — Most Pendower new build clients we work with are second-time builders — they've seen the templated approach fail once already.
Get a free feasibility viewWhat we focus on
New Builds considerations specific to Pendower.
01
Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.
02
Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.
03
Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.
04
Cornwall's housing policy increasingly favours principal residence and replacement dwelling schemes over open-market new builds in some parishes.
Local context
Why Pendower is its own job.
In Pendower the planning picture is specific: planning scrutiny often focuses on visual impact, occupancy, parking, overlooking and whether replacement buildings respect the coastal edge. For new build specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Pendower drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. That local reading is what makes a Pendower (TR2) project different from a generic Cornwall scheme — and is the whole reason we work this way. On detached houses in particular — the kind you'll also find toward St Austell — the new build brief always has to read the existing fabric first.
Planning note
Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.
Local watch-list
Common Pendower pitfalls we plan around.
Watch #1
AONB landscape-impact scrutiny on visible elevations
Watch #2
Coastal exposure driving fixing, render and joinery spec
Pendower is part of Veryan
Pendower sits inside the Veryan catchment — we cover both as one new build territory.
See New Builds in Veryan →Local fabric
What sets a Pendower new build brief apart.
Building stock
Across Pendower (TR2) we work on coastal bungalows, holiday lets, second homes, detached houses, replacement dwellings. Each stock type drives a different new build response — detached houses in particular needs careful detailing here.
Parish & policy
Pendower sits in the parish of Pendower, which matters for how parish-level consultation lands on a new build application.
Coverage
We cover TR2 from our studio, with regular new build jobs also running in Veryan, Portloe, Truro. Most Pendower site visits get booked within the same week.
Can you handle both planning and build in Pendower?
Yes — design, planning, building regs and full construction run under one roof. For clients with an existing Pendower builder we can stop at a tender-ready Full Plans pack instead.
Request a free visitWho this is for
Pendower runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every new build enquiry from the use-class up.
FAQs
Pendower New Builds — local questions answered.
- What about utilities, drainage and access?
- All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required. In Pendower specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
- What's a replacement dwelling and is mine eligible?
- If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history.
- How long does the whole project take?
- Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.
- How much does a new build cost?
- Realistic budgets in Cornwall start around £2,800 per square metre for a good-quality build and rise quickly with bespoke joinery, large glazing, complex sites and high-spec finishes. We work to your number, not against it.
- Can I build a new house on my plot in Cornwall?
- Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch.
Other services in Pendower
Nearby places we cover
The TR2 stretch of Roseland has its own rhythm; our new build work respects it, and Cornwall Council usually responds in kind.
