Bespoke New Builds in Playing Place
A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. In Playing Place, that work is shaped by the place itself — Playing Place is a residential village south of Truro on the A39, with strong commuter demand and steady infill development pressure, with a building stock that leans toward 1960s estates and Edwardian and Victorian cottages on the fringes.
Local context
Why Playing Place is its own job.
Outside Conservation Area and AONB. Kea parish operates active input on infill schemes; sewerage capacity has shaped some recent decisions. For new build specifically, Playing Place sits outside the headline designations, which usually gives a slightly more flexible starting point — but parish-level character still matters. That's why we treat every Playing Place project as a TR3-area job first — not a generic Cornwall job with a postcode bolted on.
Planning note
Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.
What we focus on
New Builds considerations specific to Playing Place.
01
AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.
02
Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.
03
Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.
Our process
How a Playing Place new build project runs.
Step 1
Plot review
Site visit, planning history check, designation review and an honest feasibility verdict.
Step 2
Concept design
Sketches that test the plot in massing, orientation and approach before any drawings are committed.
Step 3
Planning
Pre-app, full planning, consultee management and condition discharge.
Step 4
Technical design and build prep
Building regs, structural design, services strategy and contractor procurement.
Step 5
Construction and handover
Build delivered under contract administration with regular client reviews.
Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.
FAQs
Playing Place New Builds — common questions.
- What's a replacement dwelling and is mine eligible?
- If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history. In Playing Place specifically, we'd start by checking the latest parish-level planning history before committing to a direction.
- How long does the whole project take?
- Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.
- What about utilities, drainage and access?
- All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required.
- How much does a new build cost?
- Realistic budgets in Cornwall start around £2,800 per square metre for a good-quality build and rise quickly with bespoke joinery, large glazing, complex sites and high-spec finishes. We work to your number, not against it.