North Cornwall · PL28

New Builds that reads Porthcothan properly

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. The Porthcothan version of this work has its own character — Porthcothan is a holiday-coast settlement in the PL28 area, with strong second-home demand and exposed coastal building conditions, with a building stock that leans toward detached houses and coastal bungalows.

Porthcothan sits in North Cornwall — covering PL28 from Padstow, St Eval, Trevone outward.

  • Cornwall AONB
  • Coastal exposure zone
  • One studio — design, planning and build under one roof
  • Local to North Cornwall — not a national franchise
  • Same team on paper as on site
  • Fixed-fee planning packages, no surprise invoices

Local watch-list

Common Porthcothan pitfalls we plan around.

  • Watch #1

    AONB landscape-impact scrutiny on visible elevations

  • Watch #2

    Coastal exposure driving fixing, render and joinery spec

Who this is for

Porthcothan runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every new build enquiry from the use-class up.

Local context

Why Porthcothan is its own job.

Around Porthcothan (PL28), planning scrutiny often focuses on visual impact, occupancy, parking, overlooking and whether replacement buildings respect the coastal edge. For new build specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Porthcothan drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. Reading Porthcothan properly up front saves more time than any drawing tool ever will. Most of our new build work in Porthcothan lands on detached houses, with detailing that has to nod to the wider St Eval streetscape.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

What we focus on

New Builds considerations specific to Porthcothan.

  • 01

    Cornwall's housing policy increasingly favours principal residence and replacement dwelling schemes over open-market new builds in some parishes.

  • 02

    AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.

  • 03

    Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.

  • 04

    Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.

Our process

How a Porthcothan new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

FAQs

Porthcothan New Builds — local questions answered.

What's a replacement dwelling and is mine eligible?
If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history. In Porthcothan specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
How long does the whole project take?
Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.
What about utilities, drainage and access?
All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required.
Can you handle a self-build for me?
Yes — from feasibility to handover. Many of our clients start as 'self-builders' on paper, then hand the actual build to us once they realise how much project management it takes.
Can I build a new house on my plot in Cornwall?
Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch.

Porthcothan is part of Padstow

Porthcothan sits inside the Padstow catchment — we cover both as one new build territory.

See New Builds in Padstow

Local proof — We typically have one or two new build jobs live in the PL28 area at any time, so the local planning officers know our drawings on sight.

Get a free feasibility view

If you're considering a new build project in the PL28 area, our deep understanding of Porthcothan's architectural character can help navigate the process smoothly.

Let's talk about your Porthcothan property

Start a conversation
Call WhatsAppFree visit