Bespoke New Builds in St Levan

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. The St Levan version of this work has its own character — St Levan is a rural parish in the TR19 area, with farmsteads, lanes and scattered homes defining its built character, with a building stock that leans toward farmhouses and rural cottages.

St Levan sits in Penwith — covering TR19 from Porthcurno, Truro, St Austell outward.

  • Cornwall AONB
  • Rural / open-countryside policy area
  • One studio — design, planning and build under one roof
  • Local to Penwith — not a national franchise
  • Same team on paper as on site
  • Fixed-fee planning packages, no surprise invoices

Local watch-list

Local snags worth knowing before drawing a St Levan new build.

  • Watch #1

    AONB landscape-impact scrutiny on visible elevations

  • Watch #2

    Tighter Local Plan tests on isolated rural dwellings

Who this is for

St Levan runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every new build enquiry from the use-class up.

Local context

Why St Levan is its own job.

Open-countryside policy, access lanes, drainage and agricultural building history all need to be addressed before drawings go too far. For new build specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. So every St Levan job runs as a TR19-specific piece of work — local policy, local fabric, local builders. Most of our new build work in St Levan lands on farmhouses, with detailing that has to nod to the wider Truro streetscape.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

What we focus on

New Builds considerations specific to St Levan.

  • 01

    Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.

  • 02

    Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.

  • 03

    Cornwall's housing policy increasingly favours principal residence and replacement dwelling schemes over open-market new builds in some parishes.

  • 04

    AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.

Our process

How a St Levan new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

FAQs

St Levan New Builds — local questions answered.

What's a replacement dwelling and is mine eligible?
If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history. In St Levan specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
How long does the whole project take?
Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.
What about utilities, drainage and access?
All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required.
Can I build a new house on my plot in Cornwall?
Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch.
Can you handle a self-build for me?
Yes — from feasibility to handover. Many of our clients start as 'self-builders' on paper, then hand the actual build to us once they realise how much project management it takes.

St Levan is part of Porthcurno

St Levan sits inside the Porthcurno catchment — we cover both as one new build territory.

See New Builds in Porthcurno

Local proof — We typically have one or two new build jobs live in the TR19 area at any time, so the local planning officers know our drawings on sight.

Get a free feasibility view

If you're considering a new build project in the TR19 area, our deep understanding of St Levan's architectural character can help navigate the process smoothly.

Let's talk about your St Levan property

Start a conversation