East Cornwall · PL13

New Builds that reads Talland properly

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. The Talland version of this work has its own character — Talland is a coastal village in the PL13 area, where sea exposure, views and seasonal pressure shape most building decisions, with a building stock that leans toward holiday homes and replacement dwellings.

Talland sits in East Cornwall — covering PL13 from Looe, Duloe, Herodsfoot outward.

  • Cornwall AONB
  • Coastal exposure zone
  • One studio — design, planning and build under one roof
  • Local to East Cornwall — not a national franchise
  • Same team on paper as on site
  • Fixed-fee planning packages, no surprise invoices

Local watch-list

Local snags worth knowing before drawing a Talland new build.

  • Watch #1

    AONB landscape-impact scrutiny on visible elevations

  • Watch #2

    Coastal exposure driving fixing, render and joinery spec

Who this is for

Talland runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every new build enquiry from the use-class up.

Local context

Why Talland is its own job.

Around Talland (PL13), coastal setting and landscape sensitivity mean rooflines, glazing, drainage and external materials need careful handling from the first sketch. For new build specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Talland drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. Reading Talland properly up front saves more time than any drawing tool ever will. Most of our new build work in Talland lands on holiday homes, with detailing that has to nod to the wider Duloe streetscape.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

What we focus on

New Builds considerations specific to Talland.

  • 01

    Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.

  • 02

    Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.

  • 03

    Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.

  • 04

    AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.

Our process

How a Talland new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

FAQs

Talland New Builds — local questions answered.

What's a replacement dwelling and is mine eligible?
If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history. In Talland specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
How long does the whole project take?
Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.
What about utilities, drainage and access?
All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required.
Can I build a new house on my plot in Cornwall?
Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch.
How much does a new build cost?
Realistic budgets in Cornwall start around £2,800 per square metre for a good-quality build and rise quickly with bespoke joinery, large glazing, complex sites and high-spec finishes. We work to your number, not against it.

Talland is part of Looe

Talland sits inside the Looe catchment — we cover both as one new build territory.

See New Builds in Looe

Local proof — Our East Cornwall workload means a Talland new build project never has to wait for an out-of-county team to drive down.

Get a free feasibility view

If you're considering a new build project in the PL13 area, our deep understanding of Talland's architectural character can help navigate the process smoothly.

Let's talk about your Talland property

Start a conversation
Call WhatsAppFree visit