Bespoke New Builds in Trewellard

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. The Trewellard version of this work has its own character — Trewellard is a former mining settlement in the TR19 area, with granite terraces, chapel buildings and industrial landscape character still visible, with a building stock that leans toward granite terraces and workers cottages.

Trewellard sits in Penwith — covering TR19 from Pendeen, Morvah, Lower Boscaswell outward.

  • Cornwall AONB
  • Cornish Mining World Heritage Site
  • Rural / open-countryside policy area
  • Measured-survey accuracy from day one
  • One studio — design, planning and build under one roof
  • Local to Penwith — not a national franchise
  • Same team on paper as on site

Local watch-list

Common Trewellard pitfalls we plan around.

  • Watch #1

    AONB landscape-impact scrutiny on visible elevations

  • Watch #2

    World Heritage Site assessment on changes visible in the mining landscape

  • Watch #3

    Tighter Local Plan tests on isolated rural dwellings

Who this is for

Trewellard runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every new build enquiry from the use-class up.

Local context

Why Trewellard is its own job.

Mining heritage, old plot widths and traditional materials make proportion and detailing more important than generic extension templates. For new build specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; the wider area forms part of the Cornish Mining World Heritage Site, which adds a heritage assessment layer to most material changes; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. So every Trewellard job runs as a TR19-specific piece of work — local policy, local fabric, local builders. Most of our new build work in Trewellard lands on granite terraces, with detailing that has to nod to the wider Morvah streetscape.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

What we focus on

New Builds considerations specific to Trewellard.

  • 01

    Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.

  • 02

    Cornwall's housing policy increasingly favours principal residence and replacement dwelling schemes over open-market new builds in some parishes.

Our process

How a Trewellard new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

FAQs

Trewellard New Builds — local questions answered.

What's a replacement dwelling and is mine eligible?
If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history. In Trewellard specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
How long does the whole project take?
Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.
What about utilities, drainage and access?
All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required.
How much does a new build cost?
Realistic budgets in Cornwall start around £2,800 per square metre for a good-quality build and rise quickly with bespoke joinery, large glazing, complex sites and high-spec finishes. We work to your number, not against it.
Can I build a new house on my plot in Cornwall?
Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch.

Trewellard is part of Pendeen

Trewellard sits inside the Pendeen catchment — we cover both as one new build territory.

See New Builds in Pendeen

Local proof — We typically have one or two new build jobs live in the TR19 area at any time, so the local planning officers know our drawings on sight.

Get a free feasibility view

If you're considering a new build project in the TR19 area, our deep understanding of Trewellard's architectural character can help navigate the process smoothly.

Let's talk about your Trewellard property

Start a conversation
Call WhatsAppFree visit