North Cornwall · PL28 · Cornwall Council North

One studio for new build in Treyarnon

📞 01736 449 281Free 15-min call · Reply within 1 working day · No sales calls

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. Treyarnon sits in North Cornwall, and that geography ends up in the drawings — Treyarnon is a holiday-coast settlement in the PL28 area, with strong second-home demand and exposed coastal building conditions, with a building stock that leans toward second homes and replacement dwellings.

Treyarnon sits in North Cornwall — just off the A39; covering PL28 from Padstow, St Eval, Trevone outward.

  • Cornwall AONB
  • Coastal exposure zone
  • One studio — design, planning and build under one roof
  • Local to North Cornwall — not a national franchise
  • Fixed-fee planning packages, no surprise invoices
  • Measured-survey accuracy from day one

Free · No obligation

Free Treyarnon feasibility call

Tell us about your new build. We reply within 1 working day — no obligation.

No spam · No sales calls · Your details stay private.

Page purpose

Drawings only, or drawings through to handover in Treyarnon?

Both routes are open on a PL28 project, and the honest answer depends on whether you already have a builder you trust. Plenty of Treyarnon clients take the drawings, tender them locally, then come back to us for the build if the numbers do not stack up.

  • Route one: feasibility, planning and a tender-ready technical pack
  • Route two: the same pack, then the build under one contract
  • Either way the survey and feasibility work is identical, so the decision can wait
  • Fees quoted per stage against the PL28 scope, not as one opaque figure

Scope

Scope options for Treyarnon clients

Not every project needs every stage. On a Treyarnon job we scope to what the site and the consent route actually require.

Planning application drawings

Existing and proposed plans, elevations, site and block plans drawn to validation standard.

Measured survey

An accurate record of what is actually there, which is where most avoidable cost is removed.

Heritage and design statements

Written justification where designation makes the design case as important as the drawing.

Full design and build

One contract from first sketch to handover, with the same team on paper and on site.

Construction and technical drawings

1:10 and 1:20 details for the parts of the job builders normally have to guess at.

Local watch-list

Local snags worth knowing before drawing a Treyarnon new build.

  • Watch #1

    AONB landscape-impact testing on anything read in long views across North Cornwall

  • Watch #2

    Exposure detailing on coastal bungalows — fixings, render systems and joinery specified for salt-laden air

  • Watch #3

    Trussed roofs and shallow foundations in the later PL28 estates, which change the structural strategy

Who this is for

Straight facts about working with us here

  • Applications for Treyarnon are handled through Cornwall Council, with Bodmin the nearest planning office we deal with regularly.
  • Designated-area work is routine here, so heritage and landscape statements are produced alongside the drawings rather than outsourced.
  • Drawings, planning and building regulations are all produced in-house, so a new build enquiry does not get passed between firms.

Planning rules change and every site is different. For the final position on your address, check with Cornwall Council as the local planning authority or the Planning Portal.

What we focus on

New Builds considerations specific to Treyarnon.

  • 01

    AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.

  • 02

    Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.

  • 03

    Replacement dwellings have specific volumetric tests — getting the ratio between existing footprint and proposed floor area right is the difference between approval and refusal.

  • 04

    Self-build CIL exemption requires the right documentation in the right order; missing a step costs five-figure sums.

Quick check

Want a straight answer on whether your Treyarnon project is worth pursuing?

Send a few details — we'll come back within 1 working day with a plain-English view on planning risk, likely cost band and whether it's a project we'd take on.

✓ Free · No obligation✓ Reply within 1 working day✓ Your details stay private

Free · No obligation

Get a free feasibility view

For projects in Treyarnon and the PL28 area.

No spam · No sales calls · Your details stay private.

Local context

Why Treyarnon is its own job.

Two things shape a Treyarnon application: parish character and policy. On policy — planning scrutiny often focuses on visual impact, occupancy, parking, overlooking and whether replacement buildings respect the coastal edge. For new build specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Treyarnon drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. Get that local reading right and the rest of the Treyarnon programme tends to run on time. On second homes in particular — the kind you'll also find toward Harlyn — the new build brief always has to read the existing fabric first.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

Our process

How a Treyarnon new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

FAQs

Treyarnon New Builds — local questions answered.

What about utilities, drainage and access?
All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required. In Treyarnon specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
What's a replacement dwelling and is mine eligible?
If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history.
How long does the whole project take?
Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that.
Can you handle a self-build for me?
Yes — from feasibility to handover. Many of our clients start as 'self-builders' on paper, then hand the actual build to us once they realise how much project management it takes.
How much does a new build cost?
Realistic budgets in Cornwall start around £2,800 per square metre for a good-quality build and rise quickly with bespoke joinery, large glazing, complex sites and high-spec finishes. We work to your number, not against it.
We live in the house. Can a new build in Treyarnon be done while we stay put?
Usually yes for single-storey and rear work, with a temporary kitchen or bathroom arrangement agreed before the start. Whole-house remodels and roof work in Treyarnon are often easier if you move out for a few weeks. We set that expectation at feasibility stage rather than halfway through.

Treyarnon is part of Padstow

Treyarnon sits inside the Padstow catchment — we cover both as one new build territory.

See New Builds in Padstow

Keep reading

Where to go next from Treyarnon

Treyarnon is covered from our Padstow run. Being a smaller place, the local detail matters more than the headline policy: lane access, neighbour proximity and what the immediate street already looks like.

The PL28 stretch of North Cornwall has its own rhythm; our new build work respects it, and Cornwall Council usually responds in kind. holiday lets in particular need a tailored structural answer.

Drawings only, or the full Treyarnon build? Bring the deeds, we will bring the survey kit for the new build.

Free · No obligation

Book a free visit in Treyarnon

No obligation. Reply usually same working day.

No spam · No sales calls · Your details stay private.

Call WhatsAppFree visit