Mid Cornwall · TR2
Renovations & Remodels in Ladock
Cornish housing stock is brilliant and infuriating in equal measure. We renovate cottages, farmhouses, mid-century homes and post-war estates — opening up layouts, fixing damp, adding light and bringing the property up to a standard worth living in. In Ladock, that work is shaped by the place itself — Ladock is a village east of Truro on the B3275, with a fifteenth-century church and a tight Conservation Area covering the village core, with a building stock that leans toward traditional cob and granite cottages and Victorian villas.
- Conservation Area
- Rural / open-countryside policy area
Local context
Why Ladock is its own job.
Conservation Area covers the village including the church. Active parish council with input on infill and barn conversion proposals. For renovation specifically, parts of Ladock sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That's why we treat every Ladock project as a TR2-area job first — not a generic Cornwall job with a postcode bolted on.
Planning note
Most Cornish renovations don't need planning — but listed status, curtilage listing, Conservation Area designation and material changes can all change that picture.
What we focus on
Renovations considerations specific to Ladock.
01
Older Cornish properties are often built with cob, rubble or solid granite — modern insulation strategies that work in cavity walls cause damp problems in solid construction. Breathable build-ups matter.
02
Asbestos surveys are standard for anything pre-2000 — we factor a survey into the programme before stripping out begins.
03
Original fireplaces, slate floors, beams and joinery are often worth rescuing; the design conversation should start with what stays, not what goes.
Our process
How a Ladock renovation project runs.
Step 1
Survey
Measured survey, condition assessment, services check and listed status review.
Step 2
Design
Layout options, material strategy and a clear list of what stays and what changes.
Step 3
Approvals
Listed Building Consent and building regulations as needed.
Step 4
Strip-out and works
Carefully sequenced demolition, structural works and rebuild.
Step 5
Finish and handover
Joinery, decoration, snagging and documentation pack.
Whole-house renovations typically run six to fourteen months on site; partial remodels two to four months.
FAQs
Ladock Renovations — common questions.
- How long does a renovation take?
- Single rooms in weeks, kitchens in two to three months, whole-house renovations in six to fourteen months depending on size and listed status. In Ladock specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
- Can I live in the house during the work?
- Sometimes yes, often no. Single-room remodels and phased work can be liveable; whole-house renovations involving rewires, replumbing or floor lifting almost never are. We're honest about this at the brief.
- What about damp and old walls?
- We assess the cause first — usually rising damp myths, blocked vents, hard cement renders trapping moisture, or roofs needing attention. A breathable repair strategy fixes most of it without chemical intervention.
- Can you renovate and extend at the same time?
- Yes, and often it's the right call — the planning, regs and disruption all happen once instead of twice. We design and price it as a single project.