Cornish housing stock is brilliant and infuriating in equal measure. We renovate cottages, farmhouses, mid-century homes and post-war estates — opening up layouts, fixing damp, adding light and bringing the property up to a standard worth living in. In Polzeath, that work is shaped by the place itself — Polzeath is the surfing village above one of north Cornwall's biggest sandy beaches, AONB-designated, with a holiday-let-heavy housing stock and increasing replacement-dwelling activity, with a building stock that leans toward 1930s coastal villas and 1960s bungalows above the beach.

  • Cornwall AONB
  • Coastal exposure zone
  • Rural / open-countryside policy area

Local context

Why Polzeath is its own job.

AONB and Heritage Coast designations across the village; cliff and dune-edge sites are tightly controlled. Local plan policy on second homes and holiday lets is being progressively tightened. For renovation specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Polzeath drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That's why we treat every Polzeath project as a PL27-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Most Cornish renovations don't need planning — but listed status, curtilage listing, Conservation Area designation and material changes can all change that picture.

What we focus on

Renovations considerations specific to Polzeath.

  • 01

    Original fireplaces, slate floors, beams and joinery are often worth rescuing; the design conversation should start with what stays, not what goes.

  • 02

    Asbestos surveys are standard for anything pre-2000 — we factor a survey into the programme before stripping out begins.

  • 03

    Older Cornish properties are often built with cob, rubble or solid granite — modern insulation strategies that work in cavity walls cause damp problems in solid construction. Breathable build-ups matter.

Our process

How a Polzeath renovation project runs.

  1. Step 1

    Survey

    Measured survey, condition assessment, services check and listed status review.

  2. Step 2

    Design

    Layout options, material strategy and a clear list of what stays and what changes.

  3. Step 3

    Approvals

    Listed Building Consent and building regulations as needed.

  4. Step 4

    Strip-out and works

    Carefully sequenced demolition, structural works and rebuild.

  5. Step 5

    Finish and handover

    Joinery, decoration, snagging and documentation pack.

Whole-house renovations typically run six to fourteen months on site; partial remodels two to four months.

FAQs

Polzeath Renovations — common questions.

How much does a full renovation cost in Polzeath?
A whole-house renovation typically lands between £1,800 and £3,000 per square metre depending on condition, listed status and finish level. We survey before quoting and don't price by guesswork. In Polzeath specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
Can you renovate and extend at the same time?
Yes, and often it's the right call — the planning, regs and disruption all happen once instead of twice. We design and price it as a single project.
How long does a renovation take?
Single rooms in weeks, kitchens in two to three months, whole-house renovations in six to fourteen months depending on size and listed status.
Can I live in the house during the work?
Sometimes yes, often no. Single-room remodels and phased work can be liveable; whole-house renovations involving rewires, replumbing or floor lifting almost never are. We're honest about this at the brief.