Renovations & Remodels in Praa Sands
Cornish housing stock is brilliant and infuriating in equal measure. We renovate cottages, farmhouses, mid-century homes and post-war estates — opening up layouts, fixing damp, adding light and bringing the property up to a standard worth living in. In Praa Sands, that work is shaped by the place itself — Praa Sands is a south-coast surf beach village backed by dunes and low cliffs, mostly mid-twentieth-century holiday and family housing in the parishes of Breage and Germoe, with a building stock that leans toward 1950s and 1960s coastal bungalows and wooden cabins and chalets.
- Cornwall AONB
- Coastal exposure zone
Local context
Why Praa Sands is its own job.
AONB designation covers the whole village; coastal and dune-edge sites face strict material and ridge-height controls. Holiday-let and second-home pressure has shaped recent local plan policy. For renovation specifically, the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Praa Sands drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. That's why we treat every Praa Sands project as a TR20-area job first — not a generic Cornwall job with a postcode bolted on.
Planning note
Most Cornish renovations don't need planning — but listed status, curtilage listing, Conservation Area designation and material changes can all change that picture.
What we focus on
Renovations considerations specific to Praa Sands.
01
Original fireplaces, slate floors, beams and joinery are often worth rescuing; the design conversation should start with what stays, not what goes.
02
Older Cornish properties are often built with cob, rubble or solid granite — modern insulation strategies that work in cavity walls cause damp problems in solid construction. Breathable build-ups matter.
03
Asbestos surveys are standard for anything pre-2000 — we factor a survey into the programme before stripping out begins.
Our process
How a Praa Sands renovation project runs.
Step 1
Survey
Measured survey, condition assessment, services check and listed status review.
Step 2
Design
Layout options, material strategy and a clear list of what stays and what changes.
Step 3
Approvals
Listed Building Consent and building regulations as needed.
Step 4
Strip-out and works
Carefully sequenced demolition, structural works and rebuild.
Step 5
Finish and handover
Joinery, decoration, snagging and documentation pack.
Whole-house renovations typically run six to fourteen months on site; partial remodels two to four months.
FAQs
Praa Sands Renovations — common questions.
- What about damp and old walls?
- We assess the cause first — usually rising damp myths, blocked vents, hard cement renders trapping moisture, or roofs needing attention. A breathable repair strategy fixes most of it without chemical intervention. In Praa Sands specifically, we'd start by checking AONB landscape sensitivity before committing to a direction.
- How long does a renovation take?
- Single rooms in weeks, kitchens in two to three months, whole-house renovations in six to fourteen months depending on size and listed status.
- Can I live in the house during the work?
- Sometimes yes, often no. Single-room remodels and phased work can be liveable; whole-house renovations involving rewires, replumbing or floor lifting almost never are. We're honest about this at the brief.
- Do I need planning permission to renovate internally?
- Usually no — except on listed buildings, where Listed Building Consent is needed for many internal alterations. We confirm the position before any wall comes down.