Extensions for Mullion (TR12)

Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. The way we approach extension in Mullion starts with a measured walk-round — Mullion is the largest village on the Lizard Peninsula, AONB-designated, with a fifteenth-century church, a working cove and the highest concentration of period housing on the peninsula, with a building stock that leans toward modern AONB-sensitive replacement dwellings and Edwardian guesthouses.

Mullion sits in Lizard Peninsula — covering TR12 from The Lizard outward.

  • Conservation Area
  • Cornwall AONB
  • Coastal exposure zone
  • Rural / open-countryside policy area
  • One studio — design, planning and build under one roof
  • Local to Lizard Peninsula — not a national franchise
  • Measured-survey accuracy from day one
  • 30+ years of Cornwall Council approvals

Our process

How a Mullion extension project runs.

  1. Step 1

    Brief

    We meet on site, talk through how you live now and what's missing from the current layout.

  2. Step 2

    Design

    Two or three sketch directions with rough budgets, then refinement of the chosen route.

  3. Step 3

    Approvals

    Planning or Cert of Lawfulness, then a full building regs package.

  4. Step 4

    Build

    Either through your own builder with our drawings, or as a full build by our team.

  5. Step 5

    Handover

    Snag, certify, hand over the keys to your new space.

Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.

Local proof — Most Mullion homeowners come to us after a extension quote elsewhere felt vague on planning — we lead with feasibility instead.

Get a free feasibility view

What we focus on

Extensions considerations specific to Mullion.

  • 01

    Cornish granite and slate-hung walls react differently to new openings than modern brickwork — lintel choice and structural sequencing matter.

  • 02

    Wind and sea-spray exposure can drive material choices on west-facing extensions; we detail accordingly.

  • 03

    Drainage on older Cornish properties is rarely on a clean modern map; CCTV survey before design is often money well spent.

  • 04

    Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.

Local context

Why Mullion is its own job.

In Mullion the planning picture is specific: mullion Conservation Area covers the village centre; the wider parish is entirely within the AONB and includes Heritage Coast designation. Cliff-edge and coastal margin sites face the strictest controls in West Cornwall. For extension specifically, parts of Mullion sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Mullion drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That local reading is what makes a Mullion (TR12) project different from a generic Cornwall scheme — and is the whole reason we work this way. On modern AONB-sensitive replacement dwellings in particular — the kind you'll also find toward Helston — the extension brief always has to read the existing fabric first.

Planning note

Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.

Local watch-list

Local snags worth knowing before drawing a Mullion extension.

  • Watch #1

    Conservation Area material and fenestration controls in central Mullion

  • Watch #2

    AONB landscape-impact scrutiny on visible elevations

  • Watch #3

    Coastal exposure driving fixing, render and joinery spec

  • Watch #4

    Tighter Local Plan tests on isolated rural dwellings

Local fabric

Mullion extensions — the local-studio difference.

Building stock

Across Mullion (TR12) we work on granite cottages around the church, Edwardian guesthouses, 1960s coastal bungalows, modern AONB-sensitive replacement dwellings. Each stock type drives a different extension response — modern AONB-sensitive replacement dwellings in particular needs careful detailing here.

Parish & policy

Mullion is its own town in Lizard Peninsula, with planning history that's specific to the TR12 catchment.

Coverage

We cover TR12 from our studio, with regular extension jobs also running in The Lizard, Helston. Most Mullion site visits get booked within the same week.

Can you handle both planning and build in Mullion?

Yes — design, planning, building regs and full construction run under one roof. For clients with an existing Mullion builder we can stop at a tender-ready Full Plans pack instead.

Request a free visit

Who this is for

Mullion runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every extension enquiry from the use-class up.

FAQs

Mullion Extensions — local questions answered.

How much does an extension cost in Mullion?
Build costs in Cornwall typically run from around £2,200 to £3,200 per square metre for a good-quality single-storey extension, more for kitchen-grade fit-out or complex glazing. We give a realistic budget before drawings start, not after. In Mullion specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
Can you handle the build as well as the design?
Yes — that's the whole point of the studio. One contract, one point of contact, no finger-pointing between architect and builder when something needs a decision on site.
What about the Party Wall Act?
If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period.
Will my house be liveable during the build?
For most rear and side extensions, yes — we sequence the works so the kitchen and one bathroom stay functional until the new build is watertight and connected.
How long does the whole process take?
Allow roughly three months for design and approvals, then twelve to twenty weeks on site for a typical single-storey extension. Wraparounds and two-storey add-ons take longer, mostly through approval and groundworks.

The TR12 stretch of Lizard Peninsula has its own rhythm; our extension work respects it, and Cornwall Council usually responds in kind.