Lizard Peninsula · TR12

Full Build that reads Mullion properly

Once drawings are approved, the build is the bit that decides whether you get the home you imagined or a frustrating compromise. We deliver projects on a single contract — design, drawings, approvals and construction — so the team that drew it is the team that builds it. Reading Mullion on the ground is half of the full build package job — Mullion is the largest village on the Lizard Peninsula, AONB-designated, with a fifteenth-century church, a working cove and the highest concentration of period housing on the peninsula, with a building stock that leans toward Edwardian guesthouses and modern AONB-sensitive replacement dwellings.

Mullion sits in Lizard Peninsula — covering TR12 from The Lizard outward.

  • Conservation Area
  • Cornwall AONB
  • Coastal exposure zone
  • Rural / open-countryside policy area
  • Measured-survey accuracy from day one
  • One studio — design, planning and build under one roof
  • Local to Lizard Peninsula — not a national franchise
  • Same team on paper as on site

Local watch-list

The TR12 constraints that shape a full build package brief.

  • Watch #1

    Conservation Area material and fenestration controls in central Mullion

  • Watch #2

    AONB landscape-impact scrutiny on visible elevations

  • Watch #3

    Coastal exposure driving fixing, render and joinery spec

  • Watch #4

    Tighter Local Plan tests on isolated rural dwellings

Who this is for

Mullion runs the full mix — owner-occupier, holiday-let, commercial and the occasional smallholding — so we scope every full build package enquiry from the use-class up.

Local context

Why Mullion is its own job.

Around Mullion (TR12), mullion Conservation Area covers the village centre; the wider parish is entirely within the AONB and includes Heritage Coast designation. Cliff-edge and coastal margin sites face the strictest controls in West Cornwall. For full build package specifically, parts of Mullion sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Mullion drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. Reading Mullion properly up front saves more time than any drawing tool ever will. Most of our full build package work in Mullion lands on Edwardian guesthouses, with detailing that has to nod to the wider Helston streetscape.

Planning note

Build delivery doesn't need planning, but planning conditions often dictate site setup, materials and working hours — we read every condition and build the programme around them.

What we focus on

Full Build considerations specific to Mullion.

  • 01

    Single-contract delivery removes the gap between architect's intent and builder's interpretation — fewer change orders, less variation cost.

  • 02

    Material lead times to Cornwall are longer than the M5 corridor; sequencing orders early protects the build programme.

  • 03

    Weather windows on Cornish coastal sites are short — getting the building watertight before autumn matters more here than in central England.

  • 04

    Off-grid sites need their own water, drainage and power solutions designed and procured rather than assumed.

Our process

How a Mullion full build package project runs.

  1. Step 1

    Pre-construction

    Programme, procurement, contractor briefing and site setup.

  2. Step 2

    Substructure

    Foundations, drainage, ground beams — the unglamorous bit that decides everything later.

  3. Step 3

    Superstructure

    Frame, roof, glazing — getting the building watertight.

  4. Step 4

    First and second fix

    Services, plaster, joinery, kitchens and bathrooms.

  5. Step 5

    Snag and handover

    Final inspection, building control sign-off, handover pack and aftercare.

Full builds run from twelve weeks for small extensions to eighteen months for new build family homes.

FAQs

Mullion Full Build — local questions answered.

How do you handle changes during the build?
Weekly client meetings, written change requests, costed and signed before work proceeds. No surprise invoices. In Mullion specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
Are you insured?
Public liability, employer's liability and contractor's all-risks cover are in place for every project, with certificates available before contract signing.
Can you build from someone else's drawings?
Yes, with a review. We'll happily build from approved drawings produced elsewhere, after a technical review to confirm the design holds up at construction stage.
What guarantees and aftercare do you offer?
Standard twelve-month defects period, plus product and workmanship warranties on relevant elements. We're a Cornish business — you'll still find us in the same studio in five years' time.
Do you handle the whole project from drawing to finish?
Yes — that's the model. One contract from feasibility to handover, with design, regs and build all under our roof. No coordination gap between designer and contractor.

Local proof — Our Lizard Peninsula workload means a Mullion full build package project never has to wait for an out-of-county team to drive down.

Get a free feasibility view

On a Mullion site the success of a full build package is decided in week one — by reading the constraints right, not by drawing them away.

Take an honest look at your Mullion options

Start a conversation