East Cornwall · PL12

Design, planning and build for Tideford extension

Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. A PL12 site visit comes before a Tideford sketch, every time — Tideford is a commuter village in the PL12 area, with everyday family housing, edge-of-village plots and quick routes to its parent town, with a building stock that leans toward modern estates and bungalows.

Tideford sits in East Cornwall — covering PL12 from Saltash, Hatt, Landrake outward.

  • Rural / open-countryside policy area
  • Cornwall Council regulars across every sub-area
  • Fixed-fee planning packages, no surprise invoices
  • Measured-survey accuracy from day one
  • One studio — design, planning and build under one roof

Local proof — Our East Cornwall workload means a Tideford extension project never has to wait for an out-of-county team to drive down.

Get a free feasibility view

Local context

Why Tideford is its own job.

Cornwall Council's lens on Tideford is consistent: applications here usually turn on neighbour amenity, parking, overlooking and whether new work fits the rhythm of existing streets. For extension specifically, Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That's why we treat every Tideford project as a PL12-area job first — not a generic Cornwall job with a postcode bolted on. The modern estates that dominate Tideford (and continue out toward Landrake) set the tone for any extension scheme here.

Planning note

Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.

What we focus on

Extensions considerations specific to Tideford.

  • 01

    Wind and sea-spray exposure can drive material choices on west-facing extensions; we detail accordingly.

  • 02

    Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.

  • 03

    Extensions over a certain proportion of the original house trigger full Part L upgrade obligations to the existing building — worth knowing before brief is set.

  • 04

    Drainage on older Cornish properties is rarely on a clean modern map; CCTV survey before design is often money well spent.

Our process

How a Tideford extension project runs.

  1. Step 1

    Brief

    We meet on site, talk through how you live now and what's missing from the current layout.

  2. Step 2

    Design

    Two or three sketch directions with rough budgets, then refinement of the chosen route.

  3. Step 3

    Approvals

    Planning or Cert of Lawfulness, then a full building regs package.

  4. Step 4

    Build

    Either through your own builder with our drawings, or as a full build by our team.

  5. Step 5

    Handover

    Snag, certify, hand over the keys to your new space.

Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.

Local fabric

Why a East Cornwall studio is the right fit for Tideford extension.

Building stock

Across Tideford (PL12) we work on post-war semis, bungalows, modern estates, older cottages, garden infill plots. Each stock type drives a different extension response — modern estates in particular needs careful detailing here.

Parish & policy

Tideford sits in the parish of Tideford, which matters for how parish-level consultation lands on a extension application.

Coverage

We cover PL12 from our studio, with regular extension jobs also running in Saltash, Hatt, Landrake. Most Tideford site visits get booked within the same week.

How quickly can you visit a Tideford site?

Usually within the same week. Tideford (PL12) is on our regular East Cornwall run, alongside Saltash, Hatt, Landrake. First visits are free and you'll get an honest feasibility view inside seven days.

Request a free visit

FAQs

Tideford Extensions — local questions answered.

Do I need planning permission for an extension?
Often no — single-storey rear extensions, side extensions and modest two-storey additions can sit inside permitted development on a typical detached house. Conservation Areas, AONB and Article 4 zones remove some of those rights, so we always check the address first. In Tideford specifically, we'd start by checking the latest parish-level planning history before committing to a direction.
Will my house be liveable during the build?
For most rear and side extensions, yes — we sequence the works so the kitchen and one bathroom stay functional until the new build is watertight and connected.
How long does the whole process take?
Allow roughly three months for design and approvals, then twelve to twenty weeks on site for a typical single-storey extension. Wraparounds and two-storey add-ons take longer, mostly through approval and groundworks.
What about the Party Wall Act?
If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period.
How much does an extension cost in Cornwall?
Build costs in Cornwall typically run from around £2,200 to £3,200 per square metre for a good-quality single-storey extension, more for kitchen-grade fit-out or complex glazing. We give a realistic budget before drawings start, not after.

Tideford is part of Saltash

Tideford sits inside the Saltash catchment — we cover both as one extension territory.

See Extensions in Saltash

Most Tideford extension enquiries start with one honest conversation about what's actually allowed — and that conversation costs nothing.

Get the PL12 planning view before you draw

Start a conversation
Call WhatsAppFree visit