East Cornwall · PL12

House Extensions in Saltash

Extensions are the bread and butter of Cornish homes — adding the kitchen-diner the original layout never had, the bedroom for a growing family, or the light and views the back of the house should always have had. In Saltash, that work is shaped by the place itself — Saltash is the gateway town to Cornwall over the Tamar, with the Royal Albert Bridge, a steep medieval main street and a strong Plymouth commuter demand for housing, with a building stock that leans toward medieval Fore Street terraces and Georgian townhouses.

  • Conservation Area
  • Coastal exposure zone

Local context

Why Saltash is its own job.

Conservation Area covers the historic Fore Street and waterfront. Tamar Bridge crossing and proximity to Plymouth shape edge-of-town residential growth significantly. For extension specifically, parts of Saltash sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; coastal salt-laden air around Saltash drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure. That's why we treat every Saltash project as a PL12-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Most extensions in Cornwall are either permitted development or a straightforward householder application — but Conservation Area and AONB sites need a more careful design conversation upfront.

What we focus on

Extensions considerations specific to Saltash.

  • 01

    Permitted development for rear extensions runs to four metres on a detached house, three on a semi or terrace — but Article 4 areas remove this in some parishes.

  • 02

    Extensions over a certain proportion of the original house trigger full Part L upgrade obligations to the existing building — worth knowing before brief is set.

  • 03

    Drainage on older Cornish properties is rarely on a clean modern map; CCTV survey before design is often money well spent.

Our process

How a Saltash extension project runs.

  1. Step 1

    Brief

    We meet on site, talk through how you live now and what's missing from the current layout.

  2. Step 2

    Design

    Two or three sketch directions with rough budgets, then refinement of the chosen route.

  3. Step 3

    Approvals

    Planning or Cert of Lawfulness, then a full building regs package.

  4. Step 4

    Build

    Either through your own builder with our drawings, or as a full build by our team.

  5. Step 5

    Handover

    Snag, certify, hand over the keys to your new space.

Typical single-storey rear extensions run twelve to twenty weeks on site; two-storey and wraparound projects sixteen to thirty weeks.

FAQs

Saltash Extensions — common questions.

What about the Party Wall Act?
If you share a wall with a neighbour or build close to a boundary, the Act applies. We flag it early, recommend a surveyor and keep the programme aligned with the notice period. In Saltash specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
How much does an extension cost in Cornwall?
Build costs in Cornwall typically run from around £2,200 to £3,200 per square metre for a good-quality single-storey extension, more for kitchen-grade fit-out or complex glazing. We give a realistic budget before drawings start, not after.
Can you handle the build as well as the design?
Yes — that's the whole point of the studio. One contract, one point of contact, no finger-pointing between architect and builder when something needs a decision on site.
How long does the whole process take?
Allow roughly three months for design and approvals, then twelve to twenty weeks on site for a typical single-storey extension. Wraparounds and two-storey add-ons take longer, mostly through approval and groundworks.

Planning a extension project in Saltash?

Start a conversation