South Cornwall · PL26

Bespoke New Builds in Gorran Haven

A bespoke new build is the longest project we do, and the most rewarding. From plot appraisal through planning, building regulations and construction, you work with one team from the first sketch to the handover walk-round. In Gorran Haven, that work is shaped by the place itself — Gorran Haven is an AONB south coast cove village south of Mevagissey, with a tight Conservation Area at the harbour and a network of cliff paths to Dodman Point, with a building stock that leans toward traditional harbour cottages and Victorian villas.

  • Conservation Area
  • Cornwall AONB
  • Coastal exposure zone
  • Rural / open-countryside policy area

Local context

Why Gorran Haven is its own job.

Conservation Area covers the harbour village; AONB and Heritage Coast across the parish. Coastal margin and cliff sites face strict controls; Dodman Point conservation considerations apply nearby. For new build specifically, parts of Gorran Haven sit within a designated Conservation Area, which means materials, fenestration and roof pitches all need to read sympathetically with the existing streetscape; the surrounding landscape falls inside the Cornwall Area of Outstanding Natural Beauty, so massing, height and landscape impact carry extra weight in any planning decision; coastal salt-laden air around Gorran Haven drives detailing choices — fixings, render systems and timber treatments all need to be specified for exposure; Cornwall Council's Local Plan applies tighter tests to isolated rural dwellings here, so design rationale and policy fit need to be set out clearly from the outset. That's why we treat every Gorran Haven project as a PL26-area job first — not a generic Cornwall job with a postcode bolted on.

Planning note

Cornwall's planning policy on new dwellings is among the most restrictive in England outside Greater London. The first conversation should be a planning conversation, not a design one.

What we focus on

New Builds considerations specific to Gorran Haven.

  • 01

    AONB and Heritage Coast designations apply to large stretches of the county; isolated new builds outside settlement boundaries face a much higher policy bar.

  • 02

    Off-grid services — package treatment plants, borehole supply, off-mains gas — are common on rural Cornish plots and need designing, not assuming.

  • 03

    Cornwall's housing policy increasingly favours principal residence and replacement dwelling schemes over open-market new builds in some parishes.

Our process

How a Gorran Haven new build project runs.

  1. Step 1

    Plot review

    Site visit, planning history check, designation review and an honest feasibility verdict.

  2. Step 2

    Concept design

    Sketches that test the plot in massing, orientation and approach before any drawings are committed.

  3. Step 3

    Planning

    Pre-app, full planning, consultee management and condition discharge.

  4. Step 4

    Technical design and build prep

    Building regs, structural design, services strategy and contractor procurement.

  5. Step 5

    Construction and handover

    Build delivered under contract administration with regular client reviews.

Most bespoke new builds run eighteen to thirty months from instruction to keys, depending on site, planning route and build complexity.

FAQs

Gorran Haven New Builds — common questions.

How long does the whole project take?
Allow six to twelve months for design and approvals, then ten to fourteen months on site for a typical four-bedroom new build. Complex sites or long planning routes extend that. In Gorran Haven specifically, we'd start by checking the Conservation Area boundary before committing to a direction.
What about utilities, drainage and access?
All designed and applied for as part of the package — water, electric, off-mains drainage where mains isn't viable, and highways access agreement with Cornwall Council where required.
What's a replacement dwelling and is mine eligible?
If a habitable dwelling exists on the plot, you can often replace it — within volumetric and design constraints set by Cornwall's Local Plan. Derelict structures sometimes qualify, sometimes don't, depending on lawful use history.
Can I build a new house on my plot in Cornwall?
Sometimes yes, sometimes no — and the honest answer needs a planning policy review of the specific site. Settlement boundary, designations, access and policy on isolated dwellings all weigh in. We give a frank read at first consultation rather than a sales pitch.

Planning a new build project in Gorran Haven?

Start a conversation