Cost · Cornwall
What drives the cost of a Cornwall extension — and why two quotes can differ by a third
Rate-per-square-metre figures from national websites are the wrong starting point for a Cornish project, because they assume level access, benign ground and a suburban finish. We would rather explain the variables that move the number than publish an average that is wrong for your site.
Free · No obligation
Ask us about your project
A free first conversation — no obligation, no sales calls.
Frequently asked
Straight answers.
- Why won't you publish a fixed price per square metre?
- Because it would be misleading. The same 25m² extension can vary substantially in cost between a level estate plot and an exposed coastal site with restricted access, and quoting an average helps nobody plan.
- What is the cheapest way to add space?
- Usually converting what you already have — garage, loft or an existing outbuilding — because the structure and enclosure exist. It is not always the right answer, but it is nearly always the cheapest per square metre.
- How do design fees work?
- We agree a fixed fee for a defined scope after the first visit, so you know what the design stage costs before committing. Build cost is separate and is priced from the drawings.
- Should I get a cost plan before planning?
- For anything substantial, yes. There is no sense obtaining permission for a scheme that turns out to be well beyond budget, and an early cost check is far cheaper than a redesign.
Want a realistic cost bracket for your project?
A free first visit gets you a banded figure based on your actual site, not a national average.