Neighbours · Cornwall

Party wall agreements, when a Cornish project needs one and how to avoid losing two months to it

Terraced and semi detached streets in Truro, Falmouth, Penzance, Redruth and Camborne mean party wall procedure comes up constantly, and it is one of the few parts of a domestic project that can add weeks to a programme purely through notice periods. It is a civil procedure separate from planning and building regulations, and neither of those consents removes the obligation.

Free · No obligation

Ask us about your project

A free first conversation — no obligation, no sales calls.

No spam · No sales calls · Your details stay private.

01

When it applies

The legislation is triggered by particular categories of work rather than by the size of the project, so a small job can require notice while a larger one does not.

  • Cutting into, raising or removing a shared wall, including inserting a beam into it
  • Building a new wall on the line of junction between two properties
  • Excavating within three metres of a neighbouring structure to a depth below its foundations
  • Excavating within six metres where a line drawn at forty five degrees would meet the neighbour's foundation
  • Loft conversions that bear on the party wall, which is most of them

02

Notices and timing

Notice must be served on the adjoining owner in advance, and the required period depends on the type of work. The neighbour can consent in writing, in which case the process ends quickly and cheaply, or dissent, in which case surveyors are appointed and an award is prepared. Building the notice period into the programme at the start turns it into a non event. Discovering it the week the builder wants to start does not.

03

The award and the schedule of condition

The award sets out what work is permitted, how and when it will be carried out, and how any damage will be dealt with. It is normally accompanied by a schedule of condition, a photographic record of the neighbour's property before work begins. That record protects both sides: it prevents disputes about pre existing cracks and it gives the neighbour genuine reassurance rather than a promise.

04

The human part

Almost every party wall dispute we see began as a surprise. A conversation and a set of drawings shown to the neighbour before the formal notice arrives converts a large proportion of potential dissents into written consents, which saves both parties surveyor fees and preserves a relationship that has to survive the build and the years after it.

Frequently asked

Straight answers.

Can my neighbour stop my extension?
No. The procedure regulates how notifiable work is carried out and how damage is handled. It does not give a veto over lawful work with planning consent.
Who pays for the surveyors?
The party carrying out the work normally bears reasonable costs, which is a strong practical argument for obtaining written consent where the work is genuinely low impact.
Does a loft conversion always need a party wall notice?
Not always, but very often, because steels usually bear into the shared wall. It depends on the structural design rather than on the appearance of the finished room.
How long does it add?
With written consent, days. With dissent and an award, typically several weeks, which is why it should start alongside the building regulations package rather than after it.

Read next

Extending on a shared boundary?

Send us the address and a sketch. We will tell you whether the work is notifiable and when the notice needs to go out.

Free · No obligation

Book your free consultation

Tell us about your project — we usually reply within 2 hours (working day).

No spam · No sales calls · Your details stay private.

Call WhatsAppFree visit