Planning application drawings, what a valid submission actually contains
Applications get held at validation far more often than they get refused, and the cause is usually a missing or incorrectly scaled drawing rather than a bad design. Knowing what the pack has to contain before it is submitted is the cheapest time saving available on any project.
Free · No obligation
Ask us about your project
A free first conversation — no obligation, no sales calls.
Frequently asked
Straight answers.
- What scale should planning drawings be at?
- Plans and elevations are commonly at 1:100 or 1:50, with location plans at a standard mapping scale. Your local planning authority publishes its own validation requirements, and those are the ones that count.
- Can I submit hand drawn plans?
- They must be accurate, to scale and legible. In practice measured, drawn plans are what officers expect, and anything ambiguous invites a validation query.
- How long does determination take?
- There are statutory target periods for householder and full applications, and validation itself takes time before the clock starts. Check current timescales with the local planning authority for your area.
- Do planning drawings work for the builder?
- No. They show form and context, not construction. The builder needs the building regulation and technical package, which is a separate and much more detailed set.
Need a planning application prepared?
We will survey the property, prepare the full pack and handle the submission and officer queries.
Free · No obligation
Book your free consultation
Tell us about your project — we usually reply within 2 hours (working day).